Tender Details

Particulars Details
Title
Maintenance Of Four Laning Of End Pandoh Bypass To Takoli Kullu Section Of Nh 21 (Km 222/700 To Km 232/500) (Sh Providing And Laying Busg And 30 Mm Thick Bc For Patch Work In Km 222/500 To 227/600).
Description
Maintenance Of Four Laning Of End Pandoh Bypass To Takoli Kullu Section Of Nh 21 (Km 222/700 To Km 232/500) (Sh Providing And Laying Busg And 30 Mm Thick Bc For Patch Work In Km 222/500 To 227/600).
Organisation PWD | State Govt. and UT
Tender Id 2025_PWD_103431_1
Reference
Number
PW/TLD/Tender/2024-42-51 dt 02.04.2025
Tender Fee 350
EMD 20000
Tender Value
Place Hanogi
Link https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=151818
Start Date April 05, 2025 22:30
End Date

11/04/2025 ( Expired 81 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap

Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap

Read more
Widening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24

Widening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Independent engineer services during oandm period for four laning of rajauli - bakhtiyarpur section of nh - 31 (new nh-20) from km. 54.405 to km 101.630 (package - ii) and 101.630 to 152.520 (package iii) on ham mode in the state of bihar.

Independent engineer services during oandm period for four laning of rajauli - bakhtiyarpur section of nh - 31 (new nh-20) from km. 54.405 to km 101.630 (package - ii) and 101.630 to 152.520 (package iii) on ham mode in the state of bihar.

Read more
Consultancy services for the preparation of detailed project report (dpr) for the four lane bypass of nh stretch from km 44/600 to km 56/600 (thamarassery ghat) of nh-766 in the state of kerala.

Consultancy services for the preparation of detailed project report (dpr) for the four lane bypass of nh&#x0d stretch from km 44/600 to km 56/600 (thamarassery ghat) of nh-766 in the state of kerala.

Read more
Independent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis

Independent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis

Read more
Engagement of user fee agency on the basis of cb through e-tender balleepur fp located at km 183.627 of end of hardoi bypass to end of hardoi district section from km. 175.080 to km 229.070 of nh-731 in uttar pradesh

Engagement of user fee agency on the basis of cb through e-tender balleepur fp located at km 183.627 of end of hardoi bypass to end of hardoi district section from km. 175.080 to km 229.070 of nh-731 in uttar pradesh

Read more
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call

6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call

Read more
Short term maintenance contract (stmc) for maintenance of nh 753 in amdi to saoner section in km 226/140 to 226/280 km 231/600 to 232/540 km 256/245 to 256/800 and km 264/800 to 265/724. (total length 2.560 km) in nagpur district in the state of ma

Short term maintenance contract (stmc) for maintenance of nh 753 in amdi to saoner section in km 226/140 to 226/280 km 231/600 to 232/540 km 256/245 to 256/800 and km 264/800 to 265/724. (total length 2.560 km) in nagpur district in the state of ma

Read more
Engagement of user fee agency on the basis of cb through e-tender at kishorpura fp at km 180.00 four lane of deoli kota section of nh-12 km 165.00 to junction of nh-76 on kota bypass on nh no. 12 in the state of rajasthan

Engagement of user fee agency on the basis of cb through e-tender at kishorpura fp at km 180.00 four lane of deoli kota section of nh-12 km 165.00 to junction of nh-76 on kota bypass on nh no. 12 in the state of rajasthan

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise