Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
In Wbtidcl 384437 Cw Rfb Sl 2
|
Description |
Development, Upgradation And Refurbishment Of The Entry, Exit Gate Smart Ticketing Gate Area Including Areas Adjacent To The Jetties At The Different Ferry Ghats Within The Dist Of Hooghly, N24 Pgs, Howrah, S24 Pgs And Kolkata Under Wbiwtlsdp Sl2
|
Organisation | WB TRANSPORT INFRASTRUCTURE DEV. CORP. LTD. | State Govt. and UT |
Tender Id | 2023_WBTID_628242_2 |
Reference Number |
|
Tender Fee | 0 |
EMD | 7.47 Lakh |
Tender Value | |
Place | Kolkata |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1343361 |
Start Date | December 28, 2023 14:30 |
End Date |
16/01/2024 ( Expired 519 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreUpgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2-lps in the state of madhya pradesh on epc mode
Upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2-lps in the state of madhya pradesh on epc mode
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreConst. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Const. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreRehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Rehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Read moreDevelopment, operation and maintenance of wayside amenities on seoni-mohgaon section of national highway 44 on lease basis in madhya pradesh (dbot-2 sites)nh44/606-500/nandour/lhs
Development, operation and maintenance of wayside amenities on seoni-mohgaon section of national highway 44 on lease basis in madhya pradesh (dbot-2 sites)nh44/606-500/nandour/lhs/madhya pradesh
Read moreConsultancy services for authority engineer for supervision of 2 lane paved shoulder / 4 laning of damoh jabalpur section of nh-34 in madhya pradesh from damoh (design ch.0.000km) to jabera (design ch.43.500) (pl 43.500 km) under nh(o) on epc mode
Consultancy services for authority engineer for supervision of 2 lane paved shoulder / 4 laning of damoh jabalpur section of nh-34 in madhya pradesh from damoh (design ch.0.000km) to jabera (design ch.43.500) (pl 43.500 km) under nh(o) on epc mode
Read moreof your Industry type