Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
๐ Procurement Opportunity: Cab Window Assembly For Ac Loco ๐ The Ministry Of Railways, Central Government, Invites Bids For The Supply Of Cab Window Assemblies For Ac Locomotives, As Per Drawing No. 05/1/42/60 Alt 3, With A Specified Glass Thickness Of 5 Mm. ๐ ๐๏ธ Bid Submission Deadline: May 28, 2024, 2:00 Pm Interested Bidders Should Refer To The Tender Document For Complete Details And Specifications. Bids Must Adhere To The Technical And Financial Criteria Set Forth In The Tender. Keywords: Cab Window Assembly, Ac Loco, Ministry Of Railways, Government Tender, Procurement, Railway Equipment| Particulars | Details |
|---|---|
| Title |
Cab Window Assembly For Ac Loco To Drg. No. 05/1/42/60 Alt 3, With Glass Thickness 5 Mm Instead Of 5.5 Mm.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106337782 |
|
Reference Number |
25231209E |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/052024/106337782/viewNitPdf_4561385.pdf |
| Start Date | May 06, 2024 20:50 |
| End Date |
Expired
28/05/2024
Expired 815 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Custom bid for services - expression of interest for source development of spray tip assemblies of injectors to drg no 3317 06 3a 317 07 3 20 17 06 1 20 17 07
Read more
Construction of 300 mm dia 122 m deep hytw with connection to main pipe line for booster boring & construction of pump room in nalanda mahila college in ward no-36 situated in bihar sharif municipal corporation.
Construction of 300 mm dia 122 m deep hytw with connection to main pipe line for booster boring & construction of pump room in nalanda mahila college in ward no-36 situated in bihar sharif municipal corporation.
Read more(1) ward no. 42, in tilha dharamshala locality, azad bhawan lane, from dilip soni's house to azad bhawan and from azad bhawan to bharat mistri (2) tilha dharamshala locality, western lane, from bhola saw's house to sanjay rajak's (main road) house (3) from chandan ji's house to muskan beauty parlour, manoj ji's lane and sumit ji's lane, construction of pcc road and rcc drain. gaya ji
(1) ward no. 42, in tilha dharamshala locality, azad bhawan lane, from dilip soni's house to azad bhawan and from azad bhawan to bharat mistri (2) tilha dharamshala locality, western lane, from bhola saw's house to sanjay rajak's (main road) house (3) from chandan ji's house to muskan beauty parlour, manoj ji's lane and sumit ji's lane, construction of pcc road and rcc drain. gaya ji
Read moreTurnkey contract for construction of 01 no new 33kv line at gaya ji of sbpdcl to provide connectivity and electrical infrastructure for 3 nos. of proposed pss for integrated manufacturing centre (imc), gaya ji, bihar for amritsar kolkata integrated centre (akic), gamhariaunder (state plan) with all associated works under sbpdcl
Turnkey contract for construction of 01 no new 33kv line at gaya ji of sbpdcl to provide connectivity and electrical infrastructure for 3 nos. of proposed pss for integrated manufacturing centre (imc), gaya ji, bihar for amritsar kolkata integrated centre (akic), gamhariaunder (state plan) with all associated works under sbpdcl
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreCab window assembly for ac loco to drg. no. 05/1/42/60 (alt-3) with glass thickness 5 mm instead of 5.5 mm.
For complete deion and other details, please refer to tender
Read moreCab window assembly for ac loco to drg. no. 05/1/42/60 alt-3, with glass thickness 5 mm instead of 5.5 mm.
For complete deion and other details, please refer to tender
Read moreCab window assembly for ac loco to drg. no. 05/1/42/60 alt-3, with glass thickness 5 mm instead of 5.5 mm.
For complete deion and other details, please refer to tender
Read moreGlass shutter assembly. for cab as per clw s drg. no. 05/1/42/60, (alt-3).
For complete deion and other details, please refer to tender
Read moreof your Industry type