Plan For Dismantling/Reerection Of Mulawith Tpi Approval,Dismantling /Re Erection Of Mul As With St
Description
Organisation NA | Ministry of Petroleum and Natural Gas
Tender Id GEM/2025/B/5994946
Reference
Number
Tender Fee
EMD
Tender Value
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date February 25, 2025 20:37
End Date
Expired 18/03/2025

Expired 467 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Tender Result
Tender Status: Active
Additional Information: Average Turn Over of Last 3 Years: 6 Lakhs Experience with Gov. Required: Years
Buyer Details
Name: Shivraj Singh
Address: Shivraj Singh,[email protected],HPCL Mangalore LPG Import Facility, Village Bala, Via Katipalla, Mangalore-575030,Dakshina Kannada,KARNATAKA,575030,India,0824-2866607-
Ministry: Ministry Of Petroleum And Natural Gas
Department: Na
Organisation: Hindustan Petroleum Corporation Ltd
Office Address: Petroleum House
Similar Tenders
General-gmc -ekm -deposit work- annual plan 2025-26-implementation of plan scheme creation of patient friendly hospital environment at govt. medical ernakulam-rectification works of toilet plumbing duct leakage of hospital buildings (water line an

Dismantling of old existing&amp#x0d c.i pipes,steel work for purlin/single section with g i pipes, providing and fixing pvc pipes-on external walls with various dia ,elbows ,bend, door elbow, tee,door tee, vent cowl,end cap, socket or coupling etc

Read more
Shifting dismantling of 33kv dilighat feeder for construction of new 33kv avfccl feeder under namrup electrical sub division

Shifting dismantling of 33kv dilighat feeder for construction of new 33kv avfccl feeder under namrup electrical sub division

Read more
A)extension of overhead line through ab cable for illumination purpose b)installation of distribution transformer c)erection of 3.3kv ohl for installed of 315kva transformer d)renovation and erection of 440 volt head line of sarubera colliery .

A)extension of overhead line through ab cable for illumination purpose b)installation of distribution transformer c)erection of 3.3kv ohl for installed of 315kva transformer d)renovation and erection of 440 volt head line at sarubera colliery.

Read more
Appointment of master plan consultant to prepare the integrated master plan, detailed development plan, infrastructure dpr and transaction-ready project packages for the medi-city project

Appointment of master plan consultant to prepare the integrated master plan, detailed development plan, infrastructure dpr and transaction-ready project packages for the medi-city project

Read more
Work for erection of pole in long span and replacement of jarjar wire in edc fatehpur

Work for erection of pole in long span and replacement of jarjar wire in edc fatehpur

Read more
Erection and reorganisation of main 11kv overhead line and installation of 1.6mva power transformer 11kv/3.3kv with ht panel at pit office substation with busbar arrrangement at topa ocp under kuju area.

Erection and reorganisation of main 11kv overhead line and installation of 1.6mva power transformer 11kv/3.3kv with ht panel at pit office substation with busbar arrangement at topa ocp under kuju area.

Read more
Design, engg, supply, erection, testing and comi of dry ash pre con sys for augmentation of ahs sys.

Design, engg, supply, erection, testing and comi of dry ash pre con sys for augmentation of ahs sys.

Read more
Wild life conservation plan authenticated by chief wild life warden for the radius of 10 km

Wild life conservation plan authenticated by chief wild life warden for the radius of 10 km

Read more
Supply, erection and civil package for extension of 400/220kv raipur (pg) s/s for installation of 1x500mva ict (4th) under the transmission scheme - augmentation of transformation capacity at 400/220kv raipur (pg) s/s by 400/220kv 1x500mva ict (4th) along with associated bays at both ends

Supply, erection and civil package for extension of 400/220kv raipur (pg) s/s for installation of 1x500mva ict (4th) under the transmission scheme - augmentation of transformation capacity at 400/220kv raipur (pg) s/s by 400/220kv 1x500mva ict (4th) along with associated bays at both ends

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise