Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Maintaining Observation Of Water Level At Reservoir Site Clearance Of Chocked Trash Rack Of Trench Weir Ganvi Intake Ii Wef 1 07 2025to 31 12 2025 (184 Days).
|
| Description |
Maintaining Observation Of Water Level At Reservoir Site Clearance Of Chocked Trash Rack Of Trench Weir Ganvi Intake Ii Wef 1 07 2025to 31 12 2025 (184 Days).&Amp#X0d
&Amp#X0d
|
| Organisation | HPSEBL | State Govt. and UT |
| Tender Id | 2025_HPSEB_108847_1 |
|
Reference Number |
HPSEBL/GPHD/DB-9/2025-26-38 |
| Tender Fee | 590 |
| EMD | 4635 |
| Tender Value | - |
| Place | Jeori |
| Link |
View Original Tender Notice
https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=159051 |
| Start Date | June 27, 2025 22:40 |
| End Date |
Expired
02/07/2025
Expired 466 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Maintaining/ observation of water level at intake ganvi-i, operation of intake gate and sfc gate, clearance of chocked trash rack of trench weir ganvi intake-i wef 1-07-2025to 28-02-2026 253 days).
Maintaining/ observation of water level at intake ganvi-i, operation of intake gate and sfc gate, clearance of chocked trash rack of trench weir ganvi intake-i wef 1-07-2025to 28-02-2026 253 days).
Read moreClearance of chocked trash rack of trench weir ganvi intake-ii round the clock in three shifts wef 16.06.2026 to 15.09.2026 (92 days)
Clearance of chocked trash rack of trench weir ganvi intake-ii round the clock in three shifts wef 16.06.2026 to 15.09.2026 (92 days)
Read moreClearance of chocked trash rack of trench weir ganvi intake -1 w.e.f 16.05.2025 to 16.12.2025(230 days)
Clearance of chocked trash rack of trench weir ganvi intake -1 w.e.f 16.05.2025 to 16.12.2025(230 days)
Read moreClearance of chocked trash rack of trench weir ganvi intake-i opening of de-silting chamber valves 5 nos round the clock in three shifts wef 16.06.2026 to 15.09.2026 (92 days)
Clearance of chocked trash rack of trench weir ganvi intake-i opening of de-silting chamber valves 5 nos round the clock in three shifts wef 16.06.2026 to 15.09.2026 (92 days)
Read moreRestoration of trench weir u/s and d/s of trash rack ,construction of rcc beam u/s of trench weir and restoration of washed away trash rack (10nos) of 10mw ganvi power house stage-ii
Restoration of trench weir u/s and d/s of trash rack ,construction of rcc beam u/s of trench weir and restoration of washed away trash rack (10nos) of 10mw ganvi power house stage-ii
Read moreRepair of trench weir u/s and d/s of trash rack of ganvi intake stage-ii (10mw) damaged due to heavy flood in ganvi khad during july, 2023 under ganvi power house division jeori.
Repair of trench weir u/s and d/s of trash rack of ganvi intake stage-ii (10mw) damaged due to heavy flood in ganvi khad during july, 2023 under ganvi power house division jeori.
Read moreTender for repair/restoration of trash rack and trench weir u/s and d/s of trash rack and d/s of cut off beam of ganvi power house (2x11.25mw) inake stage-i which was damaged due to heavy flood in ganvi khad on dated 31.07.2024 (night) under ganvi
Tender for repair/restoration of trash rack and trench weir u/s and d/s of trash rack and d/s of cut off beam of ganvi power house (2x11.25mw) inake stage-i which was damaged due to heavy flood in ganvi khad on dated 31.07.2024 (night) under ganvi
Read moreMaintaining/observation of water level at forebay of ganvi power house stage-i round the clock and conveying the same to intake and control room of ganvi power house and cleaning of trash rack at forebay including watch and ward of ganvi rest hous
Maintaining/observation of water level at forebay of ganvi power house stage-i round the clock and conveying the same to intake and control room of ganvi power house and cleaning of trash rack at forebay including watch and ward of ganvi rest hous
Read moreMaintaining/observation of water level at forebay of ganvi power house stage-i round the clock and conveying the same to intake and control room of ganvi power house and cleaning of trash rack w.e.f. 01.10.2024 to 31.03.2025 (182days)
Maintaining/observation of water level at forebay of ganvi power house stage-i round the clock and conveying the same to intake and control room of ganvi power house and ganvi power house stage-i w.e.f. 01.10.2024 to 31.03.2025 (182days)
Read moreof your Industry type