Tender Details
Particulars | Details |
---|---|
Title |
Repair Of Trench Weir U/S And D/S Of Trash Rack Of Ganvi Intake Stage Ii (10 Mw) Damaged Due To Heavy Flood In Ganvi Khad During July, 2023 Under Ganvi Power House Division Jeori.
|
Description |
Repair Of Trench Weir U/S And D/S Of Trash Rack Of Ganvi Intake Stage Ii (10 Mw) Damaged Due To Heavy Flood In Ganvi Khad During July, 2023 Under Ganvi Power House Division Jeori.
|
Organisation | HPSEBL | State Govt. and UT |
Tender Id | 2024_HPSEB_87596_1 |
Reference Number |
HPSEBL/SEGB/DB-7/2023-24 |
Tender Fee | 1180 |
EMD | 7667 |
Tender Value | |
Place | Ganvi |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=130126 |
Start Date | March 01, 2024 20:50 |
End Date |
07/03/2024 ( Expired 411 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tender for removal and disposal of silt accumulated in the reservoir including cuneate during complete shutdown of ganvi 2x5mw power house stage 2 under resident engineer ganvi power house division jeori shimla
&#x0d tender for removal and disposal of silt accumulated in the reservoir including cuneate during complete shutdown of ganvi 2x5mw power house stage 2 under resident engineer ganvi power house division jeori shimla&#x0d
Read moreProviding assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.0
Providing assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreProviding assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from
Providing assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreMaintaining/observation of water level at forebay of ganvi power house stage-i round the clock and conveying the same to intake and control room of ganvi power house and cleaning of trash rack at forebay including watch and ward of ganvi rest hous
Maintaining/observation of water level at forebay of ganvi power house stage-i round the clock and conveying the same to intake and control room of ganvi power house and cleaning of trash rack at forebay including watch and ward of ganvi rest hous
Read moreRefilling of fire extinguisher installed at ganvi stage-2.under resident engineer, ganvi power house division hpsebl, jeori
Refilling of fire extinguisher installed at ganvi stage-2.under resident engineer, ganvi power house division hpsebl, jeori
Read moreRefilling of fire extinguisher installed at ganvi stage-1.under resident engineer, ganvi power house division hpsebl, jeori
Refilling of fire extinguisher installed at ganvi stage-1.under resident engineer, ganvi power house division hpsebl, jeori
Read moreExtension of right abutment (guide wall) of trench weir rd 13.00 to 27.00m due to change of course of ganvi khad towards right bank on ac of heavy flood on the intervening night of 31.7.2024 and 01.08.2024.
Extension of right abutment (guide wall) of trench weir rd 13.00 to 27.00m due to change of course of ganvi khad towards right bank on ac of heavy flood on the intervening night of 31.7.2024 and 01.08.2024.
Read moreExtension of right abutment (guide wall) of trench weir rd 0.00 to 13.00m due to change of course of ganvi khad towards right bank on ac of heavy flood on the intervening night of 31.7.2024 and 01.08.2024.
Extension of right abutment (guide wall) of trench weir rd 0.00 to 13.00m due to change of course of ganvi khad towards right bank on ac of heavy flood on the intervening night of 31.7.2024 and 01.08.2024.
Read moreRestoration of approach road to switchyard from outfall of trc to upstream ganvi-ii power house rd 60.00 to 70.00 m damaged due to heavy flood in ganvi khad on intervening night of 31.07.2024 and 01.08.2024 under ganvi power house division jeori
Restoration of approach road to switchyard from outfall of trc to upstream ganvi-ii power house rd 60.00 to 70.00 m damaged due to heavy flood in ganvi khad on intervening night of 31.07.2024 and 01.08.2024 under ganvi power house division jeori
Read moreRepair and complete servicing of guide vane driving end , non- driving end servo motor of unit-i found damaged during capital maintenance of unit-i of 3x42 mw larji power house, under resident engineer, larji power house division , hpsebl, thalout.
Repair and complete servicing of guide vane driving end , non- driving end servo motor of unit-i found damaged during capital maintenance of unit-i of 3x42 mw larji power house, under resident engineer, larji power house division , hpsebl, thalout.