Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wbphe/Ee/Smd/N Ie T 52 Of 2024 25/7
|
| Description |
Supply And Delivery Of Polyfilm Roll For Making Pouch From Mtu At Lot No. 8 In Connection With Ganga Sagar Mela 2025
|
| Organisation | PHE | State Govt. and UT |
| Tender Id | 2024_PHED_769279_6 |
|
Reference Number |
WBPHE/EE/SMD/NIeT-52 of 2024-25 |
| Tender Fee | 0 |
| EMD | 11000 |
| Tender Value | |
| Place | Kakdwip |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1709816 |
| Start Date | November 22, 2024 19:30 |
| End Date |
Expired
07/12/2024
Expired 572 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tender for selection of licensed electrical contractors for execution of 1kw lt electricity connection works from pole to gram panchayat (gp) bhavans in connection with implementation of amended bharat-net program (abp) in karnataka state
Tender for selection of licensed electrical contractors for execution of 1kw lt electricity connection works from pole to gram panchayat (gp) bhavans in connection with implementation of amended bharat-net program (abp) in karnataka state
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreMaintenance contract for inspection and rectification/ replacement of bearing, grout and bed blocks from jw to dwarka mor (excluding) of line-3 in phase-i section (lot-3).
Maintenance contract for inspection and rectification/ replacement of bearing, grout and bed blocks from jw to dwarka mor (excluding) of line-3 in phase-i section (lot-3).
Read moreFireproofing works on structures and equipments in connection with composite work for avu unit (part-a) for panipat refinery expansion project (p25) of m/s. indian oil corporation limited
Fireproofing works on structures and equipments in connection with composite work for avu unit (part-a) for panipat refinery expansion project (p25) of m/s. indian oil corporation limited
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreUpgradation of balance road no.02, service road and maintenance of water supply campus in housing sector-5 at i.a. jagdishpur distt. amethi
Upgradation of balance road no.02, service road and maintenance of water supply campus in housing sector-5 at i.a. jagdishpur distt. amethi
Read moreProvn of 02 x toilet blocks consisting 8 toilets for girls and boys each at children school (sr wing) kanpur cantt and provision of 01 x toilet adjacent to bldg no p-4 in cqa (gs) kanpur at cqa (gs) under ge (i) kanpur
Provn of 02 x toilet blocks consisting 8 toilets for girls
 and boys each at children school (sr wing) kanpur cantt
 and provision of 01 x toilet adjacent to bldg no p-4 in cqa
 (gs) kanpur at cqa (gs) under ge (i) kanpur
Read moreErection of 25kva transformer and necessary electric installation for giving electric supply to 55 kld stp fixed in glr sy no. 129, belagavi cantonment.
Erection of 25kva transformer and necessary electric installation for giving electric supply to 55 kld stp fixed in glr sy no. 129, belagavi cantonment.
Read moreRehabilitation of sick deep borewell twell development of borewell with air compressor and pumping set of suitable rating at twell no. g 12 in sec 19 panchkula.
Rehabilitation of sick deep borewell twell development of borewell with air compressor and pumping set of suitable rating at twell no. g 12 in sec 19 panchkula.
Read moreof your Industry type