Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ht Lt And Dtr Works
|
| Description |
Ht Lt And Dtr Work In Pe Areas Of Samba
|
| Organisation | DC-PDD | State Govt. and UT |
| Tender Id | 2025_PDD_279558_1 |
|
Reference Number |
CE/PJ/JPDCL/DA-JGUA/RDSS/01 |
| Tender Fee | 2000 |
| EMD | 1.94 Lakh |
| Tender Value | - |
| Place | SAMBA DISTRICT |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=857523 |
| Start Date | July 05, 2025 17:30 |
| End Date |
Expired
22/07/2025
Expired 428 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Developmental works in kothapally dumpingyard in huzurabad municipality under 14thfc grants(invited under earmarked works-sc communities are only eligible to participate)-2nd call
Developmental works in kothapally dumpingyard in huzurabad municipality under 14thfc grants(invited under earmarked works-sc communities are only eligible to participate)-2nd call
Read moreConservation, restoration and repair works of puranapul darwaja, hyderabad, telangana
Conservation, restoration and repair works of puranapul darwaja, hyderabad, telangana
Read moreProvn of mobile dg set alongwith associated works at 12 wing under ge (af) chandigarh
Provn of mobile dg set alongwith associated works at 12 wing under ge (af) chandigarh
Read moreFabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Read moreRepairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs raidurg, serilingampally (m) in ranga reddy district
Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs raidurg, serilingampally (m) in ranga reddy district
Read moreRepairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs miyapur, serilingampally (m) in ranga reddy district
Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs miyapur, serilingampally (m) in ranga reddy district
Read moreRepairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs darga (um), serilingampally (m) in ranga reddy district
Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs darga (um), serilingampally (m) in ranga reddy district
Read moreDesign, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy
Design, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy
Read moreHiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreof your Industry type