Tender Details

About Tender

🏭 Procurement Opportunity: Deepening And Deslting Of Open Well And Rcc Open Well Construction 🏭 Phed C.E. (Project),Jodhpur, Under The State Government And Ut, Has Issued Notification No. 15/2024 25 For The Annual Rate Contract For The Deepening And Deslting Of Open Wells And The Construction Of Rcc Open Wells, Including The Commissioning Of Wells, To Be Carried Out Under Division Falna. 📅 Bid Submission Deadline: May 30, 2024, 2:00 Pm Tender Fee: Inr 4500 Earnest Money Deposit (Emd): Inr 120000 Interested Contractors Must Submit Detailed Bids, Including Technical And Financial Proposals, In Accordance With The Project Specifications And Guidelines. Keywords: Phed, C.E. (Project), Jodhpur, Open Well, Rcc Open Well, Construction, Deepening And Deslting, Division Falna, Government Contract, Tender, Emd, Bid Submission
Particulars Details
Title
Construction Of Cwr, Pump House And Supply With Installation Of Pump Machinery In Pump Rooms At Jen Section Sayla Sub Dn Sayla Under Division Jalore)
Description
Construction Of Cwr, Pump House And Supply With Installation Of Pump Machinery In Pump Rooms At Jen Section Sayla Sub Dn Sayla Under Division Jalore)
Organisation PHED - C.E. (Project),Jodhpur | State Govt. and UT
Tender Id 2024_PHCJO_391591_1
Reference
Number
NIT No 15/2024-25
Tender Fee 2000
EMD 60000
Tender Value
Place Sayla
Link https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=808478
Start Date March 03, 2025 14:30
End Date

13/03/2025 ( Expired 38 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Supply and installation commissioning of mri compatible syringe pump at aiims bhubaneswar

Supply and installation commissioning of mri compatible syringe pump at aiims bhubaneswar

Read more
Construction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode

Construction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode

Read more
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan

Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan

Read more
Long term rectification of morth identified blackspots by construction of lvup vup n fob under the project maharashtra karnataka border sangareddy section of nh65from km.352.188 to km.497.174 in the state of karnataka and telangana

Long term rectification of morth identified blackspots by construction of lvup vup n fob under the project maharashtra karnataka border sangareddy section of nh65from km.352.188 to km.497.174 in the state of karnataka and telangana

Read more
Design and engineering, supply, installation, testing and commissioning of 100 kw ground mounted solar pv generation system without battery, at hq ce (p) chetak, bichhwal, bikaner in the state of rajasthan

Design and engineering, supply, installation, testing and commissioning of 100 kw ground mounted solar pv generation system without battery, at hq ce (p) chetak, bichhwal, bikaner in the state of rajasthan

Read more
Replacement of filter media in slow sand filter bed with replacement of door of guard room

Replacement of filter media in the slow sand filter bed with replacement of door and of guard room, repairing of storage godown and fittings and face lifting etc. at lallmitti water treatment plant under beodnabad section.

Read more
Design and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state

Design and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise