Tender Details
Particulars | Details |
---|---|
Title |
Repair/Replacement To The Centrifugal Pump Multi Stage(7 Stage) Coupled With 150 Hp Motor Of Type Rkb 125/30, Pump Sr No. 12919100056 Of Lift Irrigation Scheme Baroo Stage 2nd
|
Description |
Repair/Replacement To The Centrifugal Pump Multi Stage(7 Stage) Coupled With 150 Hp Motor Of Type Rkb 125/30, Pump Sr No. 12919100056 Of Lift Irrigation Scheme Baroo Stage 2nd
|
Organisation | Public Works Department | State Govt. and UT |
Tender Id | 2025_PWD_15693_1 |
Reference Number |
MDK/e-NIT/67 of 2024-25 |
Tender Fee | 500 |
EMD | 6000 |
Tender Value | |
Place | Kargil |
Link | https://tenders.ladakh.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=38682 |
Start Date | March 03, 2025 14:30 |
End Date |
07/03/2025 ( Expired 88 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Periodical cleaning of pump house no 1, 2, 3, 7, 11 and 13 including cleaning of all types of tanks, sump and well, repairing of pump / motor alongwith connected items, repair to ps tank and various type of valve sets at afs under ge (af) jorhat
Periodical cleaning of pump house no 1, 2, 3, 7, 11 and 13 including cleaning of all types of tanks, sump and well, repairing of pump / motor alongwith connected items, repair to ps tank and various type of valve sets at afs under ge (af) jorhat
Read moreReplacement of under ground water supply pipe line and 1 no. sinking of (200 x 100) mm dia deep tubewell and installation of 7.5 hp submersible pump motor set system of pump room no.1 at belghoria phe. (2nd call)
Replacement of under ground water supply pipe line and 1 no. sinking of (200 x 100) mm dia deep tubewell and installation of 7.5 hp submersible pump motor set system of pump room no.1 at belghoria phe. (2nd call)
Read moreRenovation of 33/3.3 kv power transformers switchyard equipments with allied accessories and hardware etc complete along with 2 years operation work for lower terana lift irrigation scheme stage no 1 to 5
Renovation of 33 3 3 kv power transformers switchyard equipments with allied accessories and hardware etc complete along with 2 years operation work for lower terana lift irrigation scheme stage no 1 to 5
Read moreSupply, installation, testing, trial and commissioning of 10 hp submersible centrifugal pump for general- lift irrigation phase-1 source creation construction of a vcb and allied works in irukutty thodu at kalluprayippady bhagam in ward no.15
Supply, installation, testing, trial and commissioning of 10 hp submersible centrifugal pump for general- lift irrigation phase-1 source creation construction of a vcb and allied works in irukutty thodu at kalluprayippady bhagam in ward no.15
Read moreSupply, installation, testing, trial and commissioning of 20 hp submersible centrifugal pump for general- vcb -vcb across pazhayarikandom thattekkallu thodu near st.sebastian church in ward no.13 of kanjikuzhy panchayath- lift irrigation -phase-1
Supply, installation, testing, trial and commissioning of 20 hp submersible centrifugal pump for general- vcb -vcb across pazhayarikandom thattekkallu thodu near st.sebastian church in ward no.13 of kanjikuzhy panchayath- lift irrigation -phase-1
Read moreA/mtc of l/s work in u.e. karnal. ( repair of 10 hp submersible motor with 8 stage pump and all other work contingent thereto .)
A/mtc of l/s work in u.e. karnal. ( repair of 10 hp submersible motor with 8 stage pump and all other work contingent thereto .)
Read moreSitc of 938 hp 5278 m3 per hr horizontal split case centrifugal pump coupled with 3.3 kv ht squirrel cage induction motor with its allied work at raoli low level reservoir and pumping station under aemww city ii section
Sitc of 938 hp 5278 m3 per hr horizontal split case centrifugal pump coupled with 3.3 kv ht squirrel cage induction motor with its allied work at raoli low level reservoir and pumping station under aemww city ii section
Read moreE- nit no. micd 22 of 2025-26 dated 13-05-2025 electromechanical prive / routine maintenance works at lift irrigation scheme koil stage 2nd
Electromechanical prive / routine maintenance works at lift irrigation scheme koil stage 2nd
Read moreProviding of 40 h.p. 7 stage well submersible open well motor pump with control panel at dabua boosting ward no. 8 and 10, nit faridabad.
Providing of 40 h.p. 7 stage well submersible open well motor pump with control panel at dabua boosting ward no. 8 and 10, nit faridabad.
Read moreRepairing/ replacement of 1000 gpm pump, 4 stage make kirloskar brothers limited, head 150/200 mtr, model rkb 150/34k, sl. no. 12953210008 under churi project, nk area
Repairing/ replacement of 1000 gpm pump, 4 stage make kirloskar brothers limited, head 150/200 mtr, model rkb 150/34k, sl. no. 12953210008 under churi project, nk area
Read moreof your Industry type