Tender Details

Particulars Details
Title
Aiho Bridge Over River Tangon At 13th Km Of Malda Bulbulchandi Road, Rehabilitation Of Both Side Approach Slab With Abutment Wall Portion And Other Allied Works Under Malda Highway Division In The District Of Malda.
Description
Aiho Bridge Over River Tangon At 13th Km Of Malda Bulbulchandi Road, Rehabilitation Of Both Side Approach Slab With Abutment Wall Portion And Other Allied Works Under Malda Highway Division In The District Of Malda.
Organisation PW(ROADS)(SH) | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 81257
Tender Value
Place MALDA
Link

AAAAAAAAAA

Login to view
Start Date May 24, 2025 00:25
End Date

13/06/2025 ( 20 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Aiho bridge over river tangon at 13th km of malda bulbulchandi road, rehabilitation of both side approach slab with abutment wall portion and other allied works under malda highway division in the district of malda.

Aiho bridge over river tangon at 13th km of malda bulbulchandi road, rehabilitation of both side approach slab with abutment wall portion and other allied works under malda highway division in the district of malda.

Read more
Construction of new banelli river bridge on km. 10 of the jaspur-dhampur road in bijnor, parallel to old existing bridge, approach roads and protection works in district bijnor.

Construction of new banelli river bridge on km. 10 of the jaspur-dhampur road in bijnor, parallel to old existing bridge, approach roads and protection works in district bijnor.

Read more
Amta bridge approach road from 3.28 km to 5.36 km, patch repairing work of amta highway sub-division under howrah highway division in the district of howrah in the year of 2025-26

Amta bridge approach road from 3.28 km to 5.36 km, patch repairing work of amta highway sub-division under howrah highway division in the district of howrah in the year of 2025-26

Read more
Construction of new banelli river bridge on km. 10 of the jaspur-dhampur road in bijnor, parallel to old existing bridge, approach roads and protection works in district bijnor.

Construction of new banelli river bridge on km. 10 of the jaspur-dhampur road in bijnor, parallel to old existing bridge, approach roads and protection works in district bijnor.

Read more
Protection of flank using uc bullah pilling at 4 side approach of gambhira bridge at ch 420 628 km of nh 14 under nh division xii in the district of birbhum during the year 2025 26

Protection of flank using uc bullah pilling at 4 side approach of gambhira bridge at ch 420 628 km of nh 14 under nh division xii in the district of birbhum during the year 2025 26

Read more
Ssi, dgn and constr of two nos maj pmt bdg of span 50m over hmaranglui river at km 98.100 and 45 m over chotta golsuri river at km 140.875 on rd l-d-p incl both side approach road for all two brs under 71 rcc/24 tf under pro psk in mizoram

Ssi, dgn and constr of two nos maj pmt bdg of span 50m over hmaranglui river at km 98.100 and 45 m over chotta golsuri river at km 140.875 on rd l-d-p incl both side approach road for all two brs under 71 rcc/24 tf under pro psk in mizoram

Read more
Urgent mtc of the burighat bridge approach (burighat face right side) under dasda sub-division,pwd(rnb) during the year 2025-26/s.h construction of r.c.c protection wall, pucca drain and approach slab etc.

Urgent mtc of the burighat bridge approach (burighat face right side) under dasda sub-division,pwd(rnb) during the year 2025-26/s.h construction of r.c.c protection wall, pucca drain and approach slab etc.

Read more
Bebari bridge over goborjoti river

Bebari bridge over goborjoti river at&amp#x0d ch. 11.630kmp. of hasimara-jaigaon&amp#x0d road - construction of di by&amp#x0d hume pipe culvert and allied work&amp#x0d under alipurduar highway division in&amp#x0d the district of alipurduar 2024-25.&amp#x0d &amp#x0d

Read more
Construction of a new 2 lane parallel bridge,approach road, and protection works near the damaged long bridge at kilometer 38 over the sot river on shahabad- bisauli-kachhla ganga ghat (nh-109) route in district badaun.

Construction of a new 2 lane parallel bridge,approach road, and protection works near the damaged long bridge at kilometer 38 over the sot river on shahabad- bisauli-kachhla ganga ghat (nh-109) route in district badaun.

Read more
Mtc of road from north anandanagar market to anandanagar 6 no para via 4 no para (l_1 point 00 km) under dukli sub division, pwd (rnb) during the year 2025_26_sh_protection wall, road side drain and other allied works (group_i)

Mtc of road from north anandanagar market to anandanagar 6 no para via 4 no para (l_1 point 00 km) under dukli sub division, pwd (rnb) during the year 2025_26_sh_protection wall, road side drain and other allied works (group_i)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise