Tender Details

Particulars Details
Title
Construction Of White Topping For Ratlam City Hazira Parisar And Officer Colony Approach Road Length 2.60 Km
Description
Construction Of White Topping For Ratlam City Hazira Parisar And Officer Colony Approach Road Length 2.60 Km
Organisation PWD- Roads and Bridges | State Govt. and UT
Tender Id 2024_PWDRB_382900_1
Reference
Number
42/SAC/2024-25 RATLAM
Tender Fee 16534
EMD 2.33 Lakh
Tender Value
Place RATLAM
Link https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=450896
Start Date November 19, 2024 16:00
End Date

04/12/2024 ( Expired 215 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of vup for rectification of blackspot id pb 03 164 of series 2017 19 at km. 287.710 grain market bhikhi on nh 148b in the state of punjab including utility shifting and excluding gst

Construction of vup for rectification of blackspot id pb 03 164 of series 2017 19 at km. 287.710 grain market bhikhi on nh 148b in the state of punjab including utility shifting and excluding gst

Read more
Widening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut

Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including

Read more
Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)

Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)

Read more
Design and constrn of 70 m major pmt br on open fdn with steel superstructure through type at km 91.42 and sub structure for 39.62 m span modular bridge at km 92.40 incl ssi and proof checking of design and dwg from iit incl approach rd on npd road

Design and constrn of 70 m major pmt br on open fdn with steel superstructure through type at km 91.42 and sub structure for 39.62 m span modular bridge at km 92.40 incl ssi and proof checking of design and dwg from iit incl approach rd on npd road

Read more
Design and constrn of 02 nos various span major minor pmt bridges on open fdn with steel superstructure through type steel girder type and 01 nos of sub structure for modular bridge incl ssi incl approach rd at km 75.98, 78.00 and km 82.35 on npd rd

Design and constrn of 02 nos various span major minor pmt bridges on open fdn with steel superstructure through type steel girder type and 01 nos of sub structure for modular bridge incl ssi incl approach rd at km 75.98, 78.00 and km 82.35 on npd rd

Read more
Design and constrn of 02 nos various span major minor pmt bridge on open fdn with ss through type and steel girder type and 01 nos of sub structure for modular bridge incl ssi at km 49.20, km 59.90 and 63.00 incl approach rd on npd road 114 rcc

Design and constrn of 02 nos various span major minor pmt bridge on open fdn with ss through type and steel girder type and 01 nos of sub structure for modular bridge incl ssi at km 49.20, km 59.90 and 63.00 incl approach rd on npd road 114 rcc

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Consultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63

Consultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63

Read more
Consultancy services for authority engineer for supervision of construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu through an engineering, procu

Consultancy services for authority engineer for supervision of construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu through an engineering, procu

Read more
Consultancy services for preparation of dpr for 4 l of rudrampur to bhadrachalam section from km 71.0 to 171.6 of vijayawada to jagadalpur section of nh 30 and construction of kothagudem bypass connecting nh 930p and nh 30 in the state of telangana

Consultancy services for preparation of dpr for 4 l of rudrampur to bhadrachalam section from km 71.0 to 171.6 of vijayawada to jagadalpur section of nh 30 and construction of kothagudem bypass connecting nh 930p and nh 30 in the state of telangana

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise