Tender Details

Particulars Details
Title
White Topping Work On Sagar City Link Road Sagar (Total Length 3.20 Km) Under Pwd Sagar Division ( Including Electrification Work)
Description
White Topping Work On Sagar City Link Road Sagar (Total Length 3.20 Km) Under Pwd Sagar Division ( Including Electrification Work)
Organisation PWD- Roads and Bridges | State Govt. and UT
Tender Id 2025_PWDRB_414419_1
Reference
Number
02/2025-26 Dt 08.04.2025
Tender Fee 31180
EMD 10 Lakh
Tender Value
Place sagar
Link https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=489862
Start Date April 09, 2025 23:00
End Date

29/04/2025 ( Expired 19 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Read more
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Read more
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand

Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand

Read more
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call

Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call

Read more
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Read more
Gopiballavpur nayagram road from 35.00 km to 41.60km

Gopiballavpur nayagram road from 35.00 km to 41.60km, strengthening work including reconstruction of 2 nos. cd structures and 215.00 m protective work under jhargram highway division in the district of jhargram.

Read more
Construction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.

Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.

Read more
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Read more
Pr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km

Pr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise