Tender Details
Particulars | Details |
---|---|
Title |
Wbphed/Ee/Msd/N Ie Q/15/23 24 1
|
Description |
Supply, Delivery And Installation Of Water Quality Parameter Testing Instruments, Reagents And Consumables For Murshidabad District Water Testing Laboratory Under Murshidabad Division, Phe Dte
|
Organisation | Government of West Bengal |
Tender Id | 2023_PHED_611782_1 |
Reference Number |
WBPHED/EE/MSD/NIeQ/15/2023-24 |
Tender Fee | |
EMD | 23000 |
Tender Value | |
Place | Office of the Executive Engineer, Murshidabad Divi |
Link | https://wbtenders.gov.in |
Start Date | December 02, 2023 00:25 |
End Date |
06/01/2024 ( Expired 515 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply testing, installation and commissioning of machinery equipment instrument hand tools etc for different cts trade courses at industrial training institute gariahat
Supply testing, installation and commissioning of machinery equipment instrument hand tools etc for different cts trade courses at industrial training institute gariahat
Read moreSupply, delivery, fandi, dismantling, installation and commissioning of control and relay panel and its associated cables as per ts for upgradation of powergrid feeders that has served more than 25 years feeders at other sebs - nerts under add cap 2024-29 block
Supply, delivery, fandi, dismantling, installation and commissioning of control and relay panel and its associated cables as per ts for upgradation of powergrid feeders that has served more than 25 years feeders at other sebs - nerts under add cap 2024-29 block
Read moreSupply, installation, trenching /hdd/ clamping, laying of duct, blowing of ofc through ducts, splicing, testing and commissioning for ofc replacement in ndls-rewari section of railtel.
Supply, installation, trenching /hdd/ clamping, laying of duct, blowing of ofc through ducts, splicing, testing and commissioning for ofc replacement in ndls-rewari section of railtel.
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreConstruction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Read moreBiennial rc for chemical supply and service on turnkey basis for cooling water treatment at cw systems of stage ii under chemical laboratory at ktps
Biennial rc for chemical supply and service on turnkey basis for cooling water treatment at cw systems of stage ii under chemical laboratory at ktps
Read moreDesign, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Design, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Read moreDesign, manufacture, supply, installation, testing and commissioning of mobile lifting jack for train car
Design, manufacture, supply, installation, testing and commissioning of mobile lifting jack for train car
Read moreDesign, supply, installation, testing, commissioning of equipment, implementation and maintenance of smart campus ict solution for sant gadge baba amravati university, amravati, maharashtra, india
Design, supply, installation, testing, commissioning of equipment, implementation and maintenance of smart campus ict solution for sant gadge baba amravati university, amravati, maharashtra, india
Read moreSupply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Read moreof your Industry type