Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Wbiw/Ee Ii/Cd/ E Nit 06e/2025 26, Sl 05
|
Description |
Clearing And Removing Of Weeds And Water Hyacinth Over Hanra Khal In Between Ch.0.00 Km To Ch.21.00 Km (Working Length 14.00 Km) Under Dimond Harbour(i) Sub Division Of Canals Division For The Year 2025.
|
Organisation | IRRIGATION AND WATERWAYS DEPT. | State Govt. and UT |
Tender Id | 2025_IWD_855306_2 |
Reference Number |
WBIW/EE-II/CD/ e-NIT-06e/2025-26 |
Tender Fee | 0 |
EMD | 33257 |
Tender Value | |
Place | Hanra Khal in between Ch.0.00 Km to Ch.21.00 Km |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1916033 |
Start Date | May 31, 2025 14:30 |
End Date |
13/06/2025 ( Expired 17 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtc. of road from ranirbazar motorstand to durganagar (upto durganagar school) under jirania sub- division pwd (r and b)(l 1.40 km) during the year 2025-2026 sh grouting, re-carpetting, seal coat, etc. (l 0.60 km, from ch.0.00 mtr to ch.600.00
Mtc. of road from ranirbazar motorstand to durganagar (upto durganagar school) under jirania sub- division pwd (r and b)(l 1.40 km) during the year 2025-2026 sh grouting, re-carpetting, seal coat, etc. (l 0.60 km, from ch.0.00 mtr to ch.600.00
Read moreDhulagarh-domjur via begri road from 0.00 km to 1.00 km and domjur-andul road from 0.00 km to 1.00 km- repair of potholes of howrah highway sub-division under howrah highway division in the district of howrah during the year 2025-26
Dhulagarh-domjur via begri road from 0.00 km to 1.00 km and domjur-andul road from 0.00 km to 1.00 km- repair of potholes of howrah highway sub-division under howrah highway division in the district of howrah during the year 2025-26
Read moreAAAAAAAAAA
Login to viewClearing and removing of water hyacinth ( one time)in between ch.4.90 k.m and 7.50 k.m of kana darakeswar within arambagh municipal area under arambagh irrigation sub division of lower damodar irrigation division for the year 2025-26.
Read moreWbiw/ee-i/ldcd/e-nit-7/2025-26 sl 1
Clearing and removing of water hyacinth of metia khal saraswati link channel kamarnala khal kousiki river for total length of 15.61 km from june 2025 upto 30th november 2025 in block domjur jagatballavpur p s domjur jagatballavpur
Read moreWbiw/ee-ii/cd/ e-nit-07(e)/2025-26, sl 01
Urgent repairing and maintenance of existing damage wooden bridge at ujilberia(deula) over sangrampur khal in mouza-ujilberia g.p-usthi block-mograhat-i dist- south 24 pgs under diamond harbour (i) sub division of canals division etc.
Read moreFdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Read moreMtc. of road from ice cream factory (near matabari school) to bramhachara road ch.0.00 km to ch.0.65 km under matabari block, gomati, tripura/s.h patch repairing, patch carpetting and allied works during the year 2025-26. (group-i)
Mtc. of road from ice cream factory (near matabari school) to bramhachara road ch.0.00 km to ch.0.65 km under matabari block, gomati, tripura/s.h patch repairing, patch carpetting and allied works during the year 2025-26. (group-i)
Read moreWbiw/ee/mdd/e-nit-05 (e)/2025-26/34
Clearing and removing floating water hyacinth and vegetative growth including floating debris of mandirbazar khal from ch. 0.00 to ch. 260.00 for a length of 7.80 km in block - mograhat-ii, p.s - mograhat, dist - south 24 parganas for 2025-26
Read moreMtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 8.00km to ch 12.00 km.
Mtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 8.00km to ch 12.00 km.
Read moreMtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 4.00km to ch 8.00 km.
Mtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 4.00km to ch 8.00 km.
Read moreof your Industry type