Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wbmad/Bm/Amrut/1/23 24/Sl1 Fresh Call
|
| Description |
Bituminous Road For Permanent Restoration Work Of Distribution Pipe Line For Zone Iv, Zone V For Water Supply Scheme Under Amrut Project Within Burdwan Municipality Phase Ii
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_MAD_600310_1 |
|
Reference Number |
WBMAD/BM/AMRUT/1/23-24 (Fresh Call) |
| Tender Fee | 0 |
| EMD | 1.58 Lakh |
| Tender Value | |
| Place | Burdwan Municipality |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | November 07, 2023 17:30 |
| End Date |
Expired
22/11/2023
Expired 935 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Work of repair and maintenance of pipe line along with road restoration work under rnd sub. division beawar in the jurisdiction of division beawar
Work of repair and maintenance of pipe line along with road restoration work under rnd sub. division beawar in the jurisdiction of division beawar
Read moreRepair/maintenance external water supply pipe line, improvement of installation and allied works at zone-5 and zone-1 (a, b, c) under ge(s) tezpur
Repair/maintenance external water supply pipe line, improvement of installation and allied works at zone-5 and zone-1 (a, b, c) under ge(s) tezpur
Read moreCanal water based water supply project for construction of 4.00 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at bhai rupa town, district bathinda punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 4.00 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at bhai rupa town, district bathinda punjab under amrut 2.0 scheme
Read moreWork of water supply scheme of revised part of gandhi nagar scheme no. 8 uit alwar deposit scheme in uwss alwar under phed division alwar
Work of water supply scheme of revised part of gandhi nagar scheme no. 8 uit alwar deposit scheme in uwss alwar under phed division alwar
Read moreWork for the installation of new 11/0.4 kv distribution transformers under the bp 2026-27 within the jurisdiction of the edd-iind, mughalsarai (on semi turn-key basis).
Work for the installation of new 11/0.4 kv distribution transformers under the bp 2026-27 within the jurisdiction of the edd-iind, mughalsarai (on semi turn-key basis).
Read moreBalance work of retrofitting work of piped water supply scheme to achieve the target of jjm for supplying water at every doorstep through functional household tap connection in villages nakjhar kala and nakjhar khurd block -sihawal dst. sidhi
Balance work of retrofitting work of piped water supply scheme to achieve the target of jjm for supplying water at every doorstep through functional household tap connection in villages nakjhar kala and nakjhar khurd block -sihawal dst. sidhi
Read moreRepair maintenance of main water supply pipe line in south camp tech area new project trg area air enclave and prayag vihar and allied area at af stn bamrauli under ge af bamrauli
Repair maintenance of main water supply pipe line in south camp tech area new project trg area air enclave and prayag vihar and allied area at af stn bamrauli under ge af bamrauli
Read moreProvision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Read moreTender for the work of package no rj-3-01/missing link/2021-22 repair work on laxmipura to arnia road under risk and cost within defect rectification period
Tender for the work of package no rj-3-01/missing link/2021-22 repair work on laxmipura to arnia road under risk and cost within defect rectification period&#x0d
Read moreSupply and stacking of coarse sand (dry) for permanent works and supply and stacking of sand/stone dust (dry) for gsb and wmm works and coarse sand (dry) for sand blanketing work between km 0.00 to km 13.00 on road area tremple-chu jn area flat-pt 44
Supply and stacking of coarse sand (dry) for permanent works and supply and stacking of sand/stone dust (dry) for gsb and wmm works and coarse sand (dry) for sand blanketing work between km 0.00 to km 13.00 on road area tremple-chu jn area flat-pt 44
Read moreof your Industry type