Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nctps I Cm Circle Cm I Periodical Cleaning Of All Drains In Bottom Ash Hopper Plant Area Boiler Area And Mill Area In Unit I Ii Iii And C Row Drain At Power House For The Period Of One Year From 01.04.2025 To 31.03.2026.
|
| Description |
Nctps I Cm Circle Cm I Periodical Cleaning Of All Drains In Bottom Ash Hopper Plant Area Boiler Area And Mill Area In Unit I Ii Iii And C Row Drain At Power House For The Period Of One Year From 01.04.2025 To 31.03.2026.
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_528844_1 |
|
Reference Number |
CE/NCTPS-I/SE/CM/82/24-25 |
| Tender Fee | 0 |
| EMD | 17400 |
| Tender Value | - |
| Place | NCTPS-I CHENNAI |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=629756 |
| Start Date | March 01, 2025 00:05 |
| End Date |
Expired
13/03/2025
Expired 581 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of stainless steel wire mesh, trough seal and plate and refractory anchor for bottom ash hopper installed at boiler of 1x500mw, sgtps, mppgcl, birsingpur.
Procurement of stainless steel wire mesh, trough seal and plate and refractory anchor for bottom ash hopper installed at boiler of 1x500mw, sgtps, mppgcl, birsingpur.
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 strengthening of eco hopper supports with new pipes and arresting of ash leakage in pent house after removal of ash from boiler inside
Mtps i bm unit ii boiler pressure parts aoh 2026 strengthening of eco hopper supports with new pipes and arresting of ash leakage in pent house after removal of ash from boiler inside
Read moreTggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Read moreRectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Rectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Read moreTtps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Ttps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - overhauling work of bottom ash hopper system and dfa system of unit no 10 btps obra power house equipment service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - overhauling work of bottom ash hopper system and dfa system of unit no 10 btps obra power house equipment service provider
Read moreKtps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Ktps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Read moreNctps i cm circle cm i periodical cleaning of all drains in a row transformer yard service building and around switch yard building for the period of one year from 01.04.2025 to 31.03.2026.
Nctps i cm circle cm i periodical cleaning of all drains in a row transformer yard service building and around switch yard building for the period of one year from 01.04.2025 to 31.03.2026.
Read moreNctps i cm circle cm i periodical cleaning of stores section inside and outside of the ware house building at nctps i for the period of one year from 01.04.2025 to 31.03.2026.
Nctps i cm circle cm i periodical cleaning of stores section&#x0d inside and outside of the ware house building at nctps i for the period of one year from&#x0d 01.04.2025 to 31.03.2026.
Read moreof your Industry type