Tender Details
Particulars | Details |
---|---|
Title |
Repairing/Renovation Work Of 2000 Mt Godown No.01 At Seoni, Of 1000 Mt Godown No.01 At Gangeruva., Of 1000 Mt Godown No.02 At Gangeruva., Of 1000 Mt Godown At Ugly And Of 1000 Mt Godown At Berghat Of Markfed , Distt. Seoni (3rd Call)
|
Description |
Repairing/Renovation Work Of 2000 Mt Godown No.01 At Seoni, Of 1000 Mt Godown No.01 At Gangeruva., Of 1000 Mt Godown No.02 At Gangeruva., Of 1000 Mt Godown At Ugly And Of 1000 Mt Godown At Berghat Of Markfed , Distt. Seoni (3rd Call)
|
Organisation | MP State Coperative Marketing Federation Ltd. | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 5295 |
EMD | 47244 |
Tender Value | |
Place | Seoni |
Link |
AAAAAAAAAA Login to view |
Start Date | April 10, 2025 23:30 |
End Date |
22/04/2025 ( 1 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Wbpwd/pw(r)/se/shc/nit no 02 of 2025-2026(2nd-call)
Herobhanga vidyasagar vidyamandir to jharkhali ferry ghat road, from 0.00 kmp to 3.80 kmp, widening and strengthening work under south 24-parganas highway division, p.w (roads) directorate in the district of south 24-parganas.
Read moreLeakage and seepage at qtr no 10/4 66/01 67/01 and 67/03 including construction of roof on main door entrance of qtr no 66/01 and 66/02 of mt platoon estt no.22 through mes dehradun under ge (p) dehradun
Leakage and seepage at qtr no 10/4 66/01 67/01 and 67/03 including construction of roof on main door entrance of qtr no 66/01 and 66/02 of mt platoon estt no.22 through mes dehradun under ge (p) dehradun
Read moreConstruction of c.c road and drain at ward no. 01 house of sultan kirar to ramkumar master. under municipal council banmore distt. morena
Construction of c.c road and drain at ward no. 01 house of sultan kirar to ramkumar master. under municipal council banmore distt. morena
Read moreConstruction of boundary wall and beautification work at infront of khearmai mandir, ward no 08, keolari, seoni
Construction of boundary wall and beautification work at infront of khearmai mandir, ward no 08, keolari, seoni
Read moreOpportunity maintenance for associated auxiliaries of tg of unit no. 01 and 02 for fy 2025 26 at 2x10 mw, bhps iv, mppgcl, jhinna
Work contract for opportunity maintenance for associated auxiliaries of tg of unit no. 01 and 02 for fy 2025 26 at 2x10 mw, bhps iv, mppgcl, jhinna
Read moreConstruction of cc road overlay work over existing old cc road and underground pipe drainage line work at different wards in nagar parishad mhowgaon under cm infra 4th phase - 3rd call
Construction of cc road overlay work over existing old cc road and underground pipe drainage line work at different wards in nagar parishad mhowgaon under cm infra 4th phase&#x0d - 3rd call&#x0d
Read moreElectrical work for renovation and modernization of mortuary cooling plant with ei works of the building of alipore police morgue at kantapukur, mominpor-sitc of air-conditioning work-2nd call.
Electrical work for renovation and modernization of mortuary cooling plant with ei works of the building of alipore police morgue at kantapukur, mominpor-sitc of air-conditioning work-2nd call.
Read moreSitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur
Sitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur
Read moreNiet no. - 02 of the fy 2025-2026 of the ee/bqa, phe dte.(2nd call)(sl.no-02)
Sinking of 2 (two) nos. 200 mm dia. x 4.50 mtr. depth horizontal river bed tube well (replacement tubewell), using ms t and laying, fitting and fixing 100 mm g.i. collecting line from river bed tube well to cwr, repairing
Read moreNiet no. - 03 of the fy 2025-2026 of the ee/bqa, phe dte.(3rd call)(sl.no-03)
Repairing and painting of over head reservoir (capacity 600 cum., staging height 20 mtr.) with all allied works of lurka (zone-vb) under raipur water supply scheme (brgf ph-i)) under khatra sub-division of bankura division, p.h.e. dte.
Read moreof your Industry type