Tender Details
Particulars | Details |
---|---|
Title |
Ktps V I And C Deputation Of Service Engineer For Conducting Capacity Test Of Exide Make Battery Banks Of Ups System And 24 V Dc Supply System Of Unit 9 During The Annual Oh 2025 26
|
Description |
Ktps V I And C Deputation Of Service Engineer For Conducting Capacity Test Of Exide Make Battery Banks Of Ups System And 24 V Dc Supply System Of Unit 9 During The Annual Oh 2025 26 Reg.
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 39 |
EMD | 1650 |
Tender Value | |
Place | TS |
Link |
AAAAAAAAAA Login to view |
Start Date | May 13, 2025 03:00 |
End Date |
23/05/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtpsi mill plant unit i dismantling and assembling of fuel inlet elbows and hard facing of fuel inlet elbows long and short during annual overhaul 2025 26
Mtpsi mill plant unit i dismantling and assembling of fuel inlet elbows and hard facing of fuel inlet elbows long and short during annual overhaul 2025 26
Read moreKtps-v-tm-supervisory charges for 2 no of service engineers for overhauling of hp bypass main valves(bp1bp2) (model:ars100), hp bypass spray valves(bpe1,bpe2 bd) (model:e32s) and hp bypass oil supply units (model:ov 32 b) in unit-ix during aoh 2025-26.
Ktps-v-tm- supervisory charges for 2 no of service engineers for overhauling of hp bypass main valves(bp1 and bp2) (model:ars100), hp bypass spray valves(bpe1,bpe2 and bd) (model:e32s) and hp bypass oil supply units (model:ov 32 b) in unit-ix during aoh 2025-26.-reg.
Read moreKtps-v-i and c-deputation of service engineer for conducting capacity test of exide make battery banks of ups system and 24v dc supply system of unit-9 during the annual oh 2025-26
Ktps-v-i and c-deputation of service engineer for conducting capacity test of exide make battery banks of ups system and 24v dc supply system of unit-9 during the annual oh 2025-26-reg.
Read moreKtps-v-tm-service supervision charges for service engineer for complete overhauling of hydraulic coupling (voith model r16k.1) of bfp-9c during unit-09 annual overhaul 2025-26.
Ktps-v-tm-service supervision charges for service engineer for complete overhauling of hydraulic coupling (voith model:r16k.1) of bfp-9c during unit-09 annual overhaul 2025-26.-reg
Read moreKtps-v-i and c-deputation of service engineer for servicing of 2x50kva ups system of unit-9 during the annual oh 2025-26
Ktps-v-i and c-deputation of service engineer for servicing of 2x50kva ups system of unit-9 during the annual oh 2025-26-reg.
Read moreKtps-v-tm-service supervision charges for service engineer for overhauling of bfps(model: fk6d30),booster pumps(model: fa1b56), ceps (model: en8h32) and de-staging of all ceps in unit-09 during annual overhaul 2025-26
Ktps-v-tm-service supervision charges for service engineer for overhauling of bfps(model fk6d30),booster pumps(model fa1b56), ceps (model en8h32) and de-staging of all ceps in unit-09 during annual overhaul 2025-26-reg.
Read moreDeputation of service engineer towards servicing of 220v dc, 160a float charger-iii and 250a boost chargers-iii of caldyne make chargers of unit-ix during unit-ix overhaul at ktps-v stage for the fy 2025-26
Deputation of service engineer towards servicing of 220v dc, 160a float charger-i and ii and 250a boost chargers-iand ii of caldyne make chargers of unit-ix during unit-ix overhaul at ktps-v stage for the fy 2025-26
Read moreService charges for deputation of authorized service personnel for conducting load test on 2 sets of 220 v dc 360 ah 108 cell vrla battery banks (make: exide) at 220kv swich yard during upcomming overhaul of unit - ix of ktps v stage
Service charges for deputation of authorized service personnel for conducting load test on 2 sets of 220 v dc 360 ah 108 cell vrla battery banks (make: exide) at 220kv swich yard during upcomming overhaul of unit - ix of ktps v stage
Read moreMtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26
Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26
Read moreKtps-v-cam-laying of fire crete cement to the bottom ash hoppers, fabrication and replacement of refractory cooling water headers and laying of 200nb ci pipes of bottom ash handling system for unit-9 during the overhaul 2025-2026-reg.
Ktps-v-cam-laying of fire crete cement to the bottom ash hoppers, fabrication and replacement of refractory cooling water headers and laying of 200nb ci pipes of bottom ash handling system for unit-9 during the overhaul 2025-2026-reg.
Read moreof your Industry type