Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rla Study Of Boiler During Oh Of Unit#6, Ktps
|
| Description |
Rla Study Of Boiler During Oh Of Unit#6, Ktps
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_WBPDC_580793_1 |
|
Reference Number |
GMOH-6(K)/ CC/BM/3589/ E2711/23-24 |
| Tender Fee | 0 |
| EMD | 12418 |
| Tender Value | - |
| Place | Tender Opening Hall,GM bldg, KTPS |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | October 13, 2023 20:30 |
| End Date |
Expired
18/11/2023
Expired 1060 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing scaffolding and surface preparation for carrying out rla study in boiler 6 at energy - mechanical in tnpl unit-i
Providing scaffolding and surface preparation for carrying out rla study in boiler 6 at energy - mechanical in tnpl unit-i
Read moreService contract for oh of boiler pr. parts (unit #5) and replacement of platen superheater coil (29 nos) under capex 24-25 during unit#5 oh under bm.
Service contract for oh of boiler pr. parts (unit #5) and replacement of platen superheater coil (29 nos) under capex 24-25 during unit#5 oh under bm.
Read moreKtps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Read moreSupply of spares for soot blowing system of air preheaters of ktps-vi stage boiler
Supply of spares for soot blowing system of air preheaters of ktps-vi stage boiler
Read moreNit for consultancy firm for feasibility study for bess and dpr for battery bank system for ktps
Nit for consultancy firm for feasibility study for bess and dpr for battery bank system for ktps
Read moreTn-26 earthing system adequacy study for 220 kv switchyard and other major electrical equipment at ktps, kota.
Earthing system adequacy study for 220 kv switchyard and other major electrical equipment at ktps, kota.
Read moreNdt of critical tube and pipings of boiler area at pvunl during
Ndt of critical tube and pipings of boiler area at pvunl duringoverhauling
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - wt-5253g work contract for conduction of rla (remaining life assessment) of boiler pressure part and corrosion mapping of boiler tubes of 1x500 mw unit at unit no 6, utp..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - wt-5253g work contract for conduction of rla (remaining life assessment) of boiler pressure part and corrosion mapping of boiler tubes of 1x500 mw unit at unit no 6, utp..
Read moreTtps mechiibmunit iiioverhauling of wind box and sadc in boiler during the year 2026 2027
Ttps mechiibmunit iiioverhauling of wind box and sadc in boiler during the year 2026 2027
Read moreTtps mech ii bm unit iii replacement of boiler pressure parts tubes bends in i pass of unit iii boiler during the year 2026 2027
Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends in i pass of unit iii boiler during the year 2026 2027
Read moreof your Industry type