Tender Details

Particulars Details
Title
Laying And Fixing Of M.S Or G.I. Pipelines Of Nominal Dia. 6inch, 8inch And 10inch For Dewatering Monsoon Water From Sumps Of Sec.I N Sec.Ii Patches At Mines Of Rajrappa Project
Description
Laying And Fixing Of M.S Or G.I. Pipelines Of Nominal Dia. 6inch, 8inch And 10inch For Dewatering&#X0d Monsoon Water From Sumps Of Sec.I N Sec.Ii Patches At Mines Of Rajrappa Project For&#X0d Upcoming Monsoon
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2026_CCL_357997_1
Reference
Number
GM(R)/SO(ENM)/Rjp/26-27/Et/3dt 4.4.26
Tender Fee 0
EMD 14500
Tender Value -
Place RAJRAPPA
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=370881

Start Date April 06, 2026 23:30
End Date
Expired 15/04/2026

Expired 164 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Laying and fixing of m.s/g.i. pipelines of nominal dia. 6inch, 8inch and 10inch for dewatering monsoon water from sumps of sec.i n sec.ii patches at mines of rajrappa project

Laying and fixing of m.s/g.i. pipelines of nominal dia. 6inch, 8inch and 10inch for dewatering monsoon water from sumps of sec.i n sec.ii patches at mines of rajrappa project.

Read more
Laying and jointing of m.s/g.i. pipelines of nominal dia. 6inch and 8inch for dewatering of sumps at sec.i n sec.ii patches on as, when and where required basis for a period of 06 months (180 days) for mines of rajrappa project

Laying and jointing of m.s/g.i. pipelines of nominal dia. 6inch and 8inch for dewatering of sumps at sec.i n sec.ii patches on as, when and where required basis for a period of 06 months (180 days) for mines of rajrappa project

Read more
Laying and jointing of m.s/g.i. pipelines of nominal dia. 6inch, 8inch and 10inch for dewatering of sumps at sec.-i and sec.-iipatches of rajrappa project for upcoming monsoon preparation

Laying and jointing of m.s/g.i. pipelines of&#x0d nominal dia. 6inch, 8inch and 10inch for dewatering of sumps at sec.-i and sec.-ii&#x0d patches of rajrappa project for upcoming monsoon preparation

Read more
Extension/ erection of ht overhead line of 3.3kv at sec.i n sec.-ii patches n 6.6kv of feeders at sec.-ii patches (route length for erection approx. 750mtr) for monsoon preparation at mines of rajrappa project

Extension/ erection of ht overhead line of 3.3kv at sec.i n sec.-ii patches n 6.6kv of feeders at sec.-ii patches (route length for erection approx. 750mtr) for monsoon preparation at mines of rajrappa project

Read more
Extension/ erection of ht overhead line of 3.3kv at sec.i n sec.-ii patches n 6.6kv of feeders at sec.-ii patches (route length for erection approx. 750mtr) for monsoon preparation at mines of rajrappa project

Extension/ erection of ht overhead line of 3.3kv at sec.i n sec.-ii&#x0d patches n 6.6kv of feeders at sec.-ii patches (route length for erection&#x0d approx. 750mtr) for monsoon preparation at mines of rajrappa project.

Read more
Pipe line dismantling, lifting/ placing/ placement of m.s. pipes (6inch dia x 20fts, 8inch dia x 20fts., 10inch dia x 20fts length) with bend making for pipeline shifting to lower bench of kalimatti sump.

Pipe line dismantling, lifting/ placing/ placement of m.s. pipes (6inch dia x 20fts, 8inch dia x 20fts., 10inch dia x 20fts length) with bend making for pipeline shifting to lower bench of kalimatti sump.

Read more
Partial di of 6inch, 8inch and 10inch dia 3 ranges existing pipe line approximate 255 mtrs. each to construct new haul road and to create space for ob dump at tapin north open cast project under hazaribagh area..

Partial di of 6inch, 8inch and 10inch dia 3 ranges existing pipe line approximate 255 mtrs. each to construct new haul road and to create space for ob dump at tapin north open cast project under hazaribagh area.

Read more
Dismantling, transportation, installation shifting of 1000 2000 3000 gpm electric diesel pump sets, pontoons including related accessories with 8inch,6inch pipelines from the sump/pump station to discharge point, fabrication of bends, nipples, etc.

Dismantling, transportation, installation shifting of 1000, 2000, 3000 gpm electric/diesel pump sets, pontoons including related accessories with 8inch/6inch pipelines from the sump/pump station to discharge point, fabrication of bends, nipples, et

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise