Tender Details
Particulars | Details |
---|---|
Title |
Laying And Jointing Of M.S/G.I. Pipelines Of Nominal Dia. 6inch And 8inch For Dewatering Of Sumps At Sec.I N Sec.Ii Patches On As, When And Where Required Basis For A Period Of 06 Months (180 Days) For Mines Of Rajrappa Project
|
Description |
Laying And Jointing Of M.S/G.I. Pipelines Of Nominal Dia. 6inch And 8inch For Dewatering Of Sumps At Sec.I N Sec.Ii Patches On As, When And Where Required Basis For A Period Of 06 Months (180 Days) For Mines Of Rajrappa Project
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_325126_1 |
Reference Number |
GM(R)/ SO(EnM)/Rjp/24-25/Et/113 dt 10.01.2025 |
Tender Fee | 0 |
EMD | 7100 |
Tender Value | |
Place | RAJRAPPA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=337014 |
Start Date | January 11, 2025 23:30 |
End Date |
20/01/2025 ( Expired 92 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Laying and fixing of m.s/g.i. pipelines of nominal dia. 6inch, 8inch and 10inch for dewatering monsoon water from sumps of sec.i n sec.ii patches at mines of rajrappa project
Laying and fixing of m.s/g.i. pipelines of nominal dia. 6inch, 8inch and 10inch for dewatering monsoon water from sumps of sec.i n sec.ii patches at mines of rajrappa project.
Read moreDay-to-day minor running maintenance/ repairing of pipelines, valves, flanges etc. at different locations of surface and mines premises on as and when required basis for a period of one year at dipka expansion project.
Day-to-day minor running maintenance/ repairing of pipelines, valves, flanges etc. at different locations of surface and mines premises on as and when required basis for a period of one year at dipka expansion project.
Read moreProviding installation and commissioning of high wall split window cassette floor mounted split type air conditioning system as and when urgently required in different areas of igm hospital agartala for a period of 06 six months
Providing installation and commissioning of high wall split window cassette floor mounted split type air conditioning system as and when urgently required in different areas of igm hospital agartala for a period of 06 six months&#x0d &#x0d
Read moreExtension/ erection of lt overhead line (approx. route length for erection/ extension is 1200m and n dismantling of lt line (approx. route length for dismantling is 600 mtr) for a period of six months (180 days) on as when and where required basis
Extension/ erection of lt overhead line (approx. route length for erection/ extension is 1200m and n dismantling of lt line (approx. route length for dismantling is 600 mtr) for a period of six months (180 days) on as when and where required basis
Read moreWork of di/extension and dismantling of lt overhead line of eastern part i.e. bramhaputra, 223, bahanpat, bhatora patch, naraibodh patch of mines on as and when required basis for quarry at gevra project for a period of 365 days.
Work of di/extension and dismantling of lt overhead line of eastern part i.e. bramhaputra, 223, bahanpat, bhatora patch, naraibodh patch of mines on as and when required basis for quarry at gevra project for a period of 365 days.
Read moreDay-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related at lower kusmunda-1 (lk-1) quarry sump on as and when required basis for a period of one year.
Day-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related at lower kusmunda-1 (lk-1) quarry sump on as and when required basis for a period of one year.
Read moreDay to day maintenance work of pumps and pipelines for dewatering of sumps and coal faces, dust suppression and tanker loading for a period of 02 years at socp, ib valley area
Day to day maintenance work of pumps and pipelines for dewatering of sumps and coal faces, dust suppression and tanker loading for a period of 02 years at socp, ib valley area
Read moreEldc. no. / smii / p10/ 343/ 2025 hiring of manpower 1 no of electrician and 4 nos of electrical helper for electrical works in ae/rb substation gcc for a period of 6 months 180 days through private agency
Hiring of manpower 1 no of electrician and 4 nos of electrical helper for electrical works in ae/rb substation gcc for a period of 6 months 180 days through private agency
Read moreProviding, installation and commissioning of high wall split/ window/ cassette floor mounted split type air conditioning system as and when urgently required in different areas of agmc and gbp hospital for 06 months period
Providing, installation and commissioning of high wall split/ window/ cassette floor mounted split type air conditioning system as and when urgently required in different areas of agmc and gbp hospital for 06 months period
Read moreShifting and positioning of 20 kg of c.i test weights for periodic (twice in a month or as n when required) calibration of road sale weighbridge near reject stock of rajrappa washery project for 01 year period
Shifting and positioning of 20 kg of c.i test weights for periodic (twice in a month or as n when required) calibration of road sale weighbridge near reject stock of rajrappa washery project for 01 year period
Read moreof your Industry type