Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
1st Class Brick Lining Work With 100pct. New Brick And C.C On Bed From Chainage 1.400 Km To 1.700 Km Including All Cost Of Material, Labour, Tool And Plant Etc. As Per Bill Of Quantity At Rudauli Pump Canal District Ayodhya
|
| Description |
1st Class Brick Lining Work With 100pct. New Brick And C.C On Bed From Chainage 1.400 Km To 1.700 Km Including All Cost Of Material, Labour, Tool And Plant Etc. As Per Bill Of Quantity At Rudauli Pump Canal District Ayodhya.
|
| Organisation | U P Irrigation Department (Mechanical) | State Govt. and UT |
| Tender Id | 2026_UPIDM_1115446_3 |
|
Reference Number |
57/EE/MLCD/LKO/2025-26 |
| Tender Fee | 2354 |
| EMD | 48071 |
| Tender Value | - |
| Place | Rudauli pump canal district Ayodhya |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2090473 |
| Start Date | March 07, 2026 21:30 |
| End Date |
Expired
12/03/2026
Expired 218 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
1st class brick lining workand repairing of delivery tank at rudauli pump canal in district ayodhya including all cost of material, labour and tool and plant etc. used complete in all respect as per drawing and boq.
1st class brick lining workand repairing of delivery tank at rudauli pump canal in district ayodhya including all cost of material, labour and tool and plant etc. used complete in all respect as per drawing and boq.
Read more1st class brick lining work with 40 percent new brick from chainage (300 to 500)mtr and (700 to 950)mtr and chainage (700 to 950)mtr alongwith cement plaster both wall chainage from (0.0 to 500)mtr, (700 to 950)mtr and 2nd stage chainage (0.0 to 100)
1st class brick lining work with 40 percent new brick from chainage (300 to 500)mtr and (700 to 950)mtr and chainage (700 to 950)mtr alongwith cement plaster both wall chainage from (0.0 to 500)mtr, (700 to 950)mtr and 2nd stage chainage (0.0 to 100)
Read more1st class brick for lining of canal with 100 percent new brick alongwith main canal bed from chainage (0.450 to 1.00) km with all cost of material, labour, tool and plant etc as required as per drawing and boq at phagoopur pump can
1st class brick for lining of canal with 100 percent new brick alongwith main canal bed from chainage (0.450 to 1.00) km with all cost of material, labour, tool and plant etc as required as per drawing and boq at phagoopur pump canal in raibareli
Read moreBrick lining on edge from chainage-0.00 to 0.450 km and construction of 07 nos outlets at hazipur pump canal in district bareilly.
Brick lining on edge from chainage-0.00 to 0.450 km and construction of 07 nos outlets at hazipur pump canal in district bareilly.
Read more1st class brick lining work from chainage (0.00 to 0.380)km with 40 percent new brick and chainage (0.380 to 1.06)km with 100 percent new brick, cement plaster both wall from (0.00 to 0.380)km and cc work from (0.00 to 0.380)km at akaradiya kala pum
1st class brick lining work from chainage (0.00 to 0.380)km with 40 percent new brick and chainage (0.380 to 1.06)km with 100 percent new brick, cement plaster both wall from (0.00 to 0.380)km and cc work from (0.00 to 0.380)km at akaradiya kala pum
Read more1st class brick lining work chainage from (0.046 to 0.176)km with 40 percent new brick and (0.220 to 0.500)km with 100 percent new brick and cc work from (0.00 to .500)km in canal be at laxmanpur pump canal, district sitapur
1st class brick lining work chainage from (0.046 to 0.176)km with 40 percent new brick and (0.220 to 0.500)km with 100 percent new brick and cc work from (0.00 to .500)km in canal be at laxmanpur pump canal, district sitapur
Read moreRepairing of old and damage brick lining work with new brick work with all cost of material, labour, tool and plant etc as required, as per drawing and boq at phagoopur pump canal, raibareli.
Repairing of old and damage brick lining work with new brick work with all cost of material, labour ,tool and plant etc as required, as per drawing and boq at phagoopur pump canal, raibareli.
Read more1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material,
1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material
Read more1st class brick lining work with 60 percent new brick from (0.00 to 0.400) km alongwith cement pointing on both side, top of the walls and cc work in bed with glass strip from (0.00 to 0.400) km and repairing of delivery tank at rudauli pump canal in
1st class brick lining work with 60 percent new brick from (0.00 to 0.400) km alongwith cement pointing on both side, top of the walls and cc work in bed with glass strip from (0.00 to 0.400) km and repairing of delivery tank at rudauli pump canal
Read moreFirst class brick lining work 1 3 cm in mawai minor from chainage 0.725 to 1.075 at kundakala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as direc
First class brick lining work 1 3 cm in mawai minor from chainage 0.725 to 1.075 at kundakala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as direc
Read moreof your Industry type