Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
M4748199009 Bulb Seal, Air Operated Gate, 1800 X1800(s),M4748046021 Springseal Bonnet Guilotine Hot
|
| Description |
|
| Organisation | Contracts and Materials | Ministry of Power |
| Tender Id | GEM/2025/B/6095609 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | April 01, 2025 16:39 |
| End Date |
Expired
22/04/2025
Expired 413 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Periodical services / maint / repair of air compressor, servo voltage stabilizers for balanced / unbalanced loads, elevators, electrically operated trolley and other misc items
Periodical services / maint / repair of air compressor, servo voltage stabilizers for balanced / unbalanced loads, elevators, electrically operated trolley and other misc items at afs sulur
Read moreSitc of 33 kv,3 pole,3 phase gang operated air break switch for replacement of worn out/damaged 33 kv air break switch near store subdivision for 33 kv ljhp-peernia transmission line
Sitc of 33 kv,3 pole,3 phase gang operated air break switch for replacement of worn out/damaged 33 kv air break switch near store subdivision for 33 kv ljhp-peernia transmission line
Read moreReplacement of old with new split type air conditioners hot and cold of 1.5 tr capacity in court room no.19 at punjab and haryana high court sector 1, chandigarh.
Replacement of old with new split type air conditioners hot and cold of 1.5 tr capacity in court room no.19 at punjab and haryana high court sector 1, chandigarh.
Read moreImprovement works for the chief engineer s office by brick wall partition screed concrete replacement of floor and bathroom tiles providing wpc wall panel false ceiling haier 4 ton round way inverter cassette air conditioner electrical instal
Improvement works for the chief engineer s office by brick wall partition screed concrete replacement of floor and bathroom tiles providing wpc wall panel false ceiling haier 4 ton round way inverter cassette air conditioner electrical install
Read moreHot air gate assembly for mill hot air duct with pneumatic power cylinder and bulb seal assembly pneumatic operated single power cylinder guilotine horizontal type ensuring 100 sealing with hastelloy material seals including electrical accessories
Hot air gate assembly for mill hot air duct with pneumatic power cylinder and bulb seal assembly pneumatic operated single power cylinder guilotine horizontal type ensuring 100 sealing with hastelloy material seals including electrical accessories
Read moreHot air gate assembly for mill hot air duct with pneumatic power cylinder and bulb seal assembly pneumatic operated single power cylinder guilotine horizontal type ensuring 100 sealing with hastelloy material seals including electrical accessories
Hot air gate assembly for mill hot air duct with pneumatic power cylinder and bulb seal assembly pneumatic operated single power cylinder guilotine horizontal type ensuring 100 sealing with hastelloy material seals including electrical accessories
Read moreProcurement of hot air gate seal for unit#8/dpps.
Procurement of hot air gate seal for unit#8/dpps.
Read moreProcurement of bulb seal and seal assy. for hot air gate and damper of unit 6 oh in the year of 2026 under bmd, stps.
Procurement of bulb seal and seal assy. for hot air gate and damper of unit 6 oh in the year of 2026 under bmd, stps.
Read moreMtps i mill plant unit ii overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during aoh 2025 26
Mtps i mill plant unit ii overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during aoh 2025 26
Read moreof your Industry type