Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Steps Along No.2 Incline 4/1 Wd To 6 L/1 Wd Of R V Seam And From Top To Incline Mouth Of Bhanora West Block Colliery
|
Description |
Construction Of Steps Along No.2 Incline 4/1 Wd To 6 L/1 Wd Of R V Seam And From Top To Incline Mouth Of Bhanora West Block Colliery
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_298015_1 |
Reference Number |
SS/GM/AMPCD/23-24/CS/BWBC/659 Date. 04.01.2024 |
Tender Fee | 0 |
EMD | 8000 |
Tender Value | |
Place | Bhanora West Block Colliery Satgram-Sripur Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=308682 |
Start Date | January 11, 2024 16:30 |
End Date |
22/01/2024 ( Expired 519 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreDye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreConstruction of 33kv line from no 11 tarajan rob to jonai dss
Construction of 33kv line from no 11 tarajan rob to jonai dss apdcl via lakhi napali village under jonai esd 4.5 ckm along with construction of 33kv terminal bay at jonai dss of apdcl and construction of 33kv ug highway crossing at no 2 torajan
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreImprovement of brick soled road to all weather road during the year 2025 26 sh construction of road from the ho dulal roy to nirmal ch roy by providing gsb, wbm ii, paver block, r wall etc. under central v sub division. l 0.130 km
Improvement of brick soled road to all weather road during the year 2025 26 sh construction of road from the ho dulal roy to nirmal ch roy by providing gsb, wbm ii, paver block, r wall etc. under central v sub division. l 0.130 km
Read moreSpl repair to roof treatment of bldg no 1 2 3 4 14 15 17 18 19 21 31 41 and allied wks at mgsf under ge (w) lko
Spl repair to roof treatment of bldg no 1 2 3 4 14 15 17 18 19 21 31 41 and allied wks at mgsf under ge (w) lko
Read moreSpecial repair to roof of building no 2(1) 2(2) 4(1) 4(2) and 5(1) 5(2) married qtr at shaitan singh enclave and certain minor works under ge (south) ambala cantt
Special repair to roof of building no 2(1) 2(2) 4(1) 4(2) and 5(1) 5(2) married qtr at shaitan singh enclave and certain minor works under ge (south) ambala cantt
Read moreConstruction of 40 nos. of ventilation stoppings by brickwork at propose section-i dist. 134nl, 130nl, 134sl dist. h.r. section-i and main dip of orient colliery mine no. 1 and 2, osa, oa, mcl.
Construction of 40 nos. of ventilation stoppings by brickwork at propose section-i dist. 134nl, 130nl, 134sl dist. h.r. section-i and main dip of orient colliery mine no. 1 and 2, osa, oa, mcl.
Read moreW.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreConstruction of the road using paver block from shani mandir to sri tanay dey house extension to sri bishal roy house in ward no 1
Construction of the road using paver block from shani mandir to sri tanay dey house extension to sri bishal roy house in ward no 1
Read moreof your Industry type