Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Bearing Bracket Assembly (Ce) 🛠️ The Ministry Of Railways, Under The Central Government, Invites Bids For The Supply Of Bearing Bracket Assemblies (Ce) With Complete Deion And Other Specifications As Detailed In The Tender Document. 📅 Bid Submission Deadline: May 27, 2024, 2:30 Pm The Earnest Money Deposit (Emd) Is Set At Inr 157780. Interested Bidders Should Review The Tender Document Thoroughly To Ensure Their Proposals Meet All The Technical And Financial Requirements. Keywords: Bearing Bracket Assembly, Ce, Ministry Of Railways, Central Government Ministry/Department, Tender, Procurement, Railways| Particulars | Details |
|---|---|
| Title |
Bearing Bracket Assembly (Ce)
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106332475 |
|
Reference Number |
26242357 |
| Tender Fee | 0 |
| EMD | 1.58 Lakh |
| Tender Value | - |
| Place | Chennai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/052024/106332475/viewNitPdf_4555273.pdf |
| Start Date | April 30, 2024 21:45 |
| End Date |
Expired
27/05/2024
Expired 859 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Read moreTggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreBearing bracket assembly (pe)
For complete deion and other details, please refer to tender
Read moreBearing bracket (sub-assembly )
For complete deion and other details, please refer to tender
Read moreBearing bracket assembly (pe)
For complete deion and other details, please refer to tender
Read moreSet of bearing bracket assembly etc.
For complete deion and other details, please refer to tender
Read moreSpider bearing bracket assembly for cooling water pumps
Spider bearing bracket assembly for cooling water pumps
Read moreSpider bearing bracket assembly for cooling water pumps
Spider bearing bracket assembly for cooling water pumps
Read moreof your Industry type