Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Kmc/Eec/Vii/67/6/24 25/B
|
| Description |
Removal Of Chokage At Swinhoe Lane, B D 1 St. Lane, P Naskar Lane Bustee And Its Surrounding Area In W/67
|
| Organisation | KOLKATA MUNICIPAL CORPORATION | State Govt. and UT |
| Tender Id | 2024_KMC_752556_1 |
|
Reference Number |
KMC/EEC/VII/67/6/24-25/B |
| Tender Fee | 0 |
| EMD | 5000 |
| Tender Value | - |
| Place | AREA UNDER BR-VII, KMC |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1663386 |
| Start Date | September 18, 2024 00:25 |
| End Date |
Expired
26/09/2024
Expired 694 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Comprehensive maint in otm and md accn of b1, b2 and b3 area of age b/r-ii under ge (west) jrc
Comprehensive maint in otm and md accn of b1, b2 and b3 area of age b/r-ii under ge (west) jrc
Read moreOnstruction of new 2-lane h.l. rcc bridge over river falgu including 4-lane trumpet in approach road in between kothwara bazar (nh-99, dobhi-chatra road) to integrated manufacturing cluster (imc) land acquire area near gamhariya samudayik bhawan and also rehabilitation of old existing 2-lane kothwara (bariya) bridge parallel to proposed alignment in district gaya, state-bihar on epc mode
Onstruction of new 2-lane h.l. rcc bridge over river falgu including 4-lane trumpet in approach road in between kothwara bazar (nh-99, dobhi-chatra road) to integrated manufacturing cluster (imc) land acquire area near gamhariya samudayik bhawan and also rehabilitation of old existing 2-lane kothwara (bariya) bridge parallel to proposed alignment in district gaya, state-bihar on epc mode
Read moreRemoval of weeds and regrading the bed portion and cleaning of flood inlets and outlets at downstream of laxmipuram anicut from ls 114.80km to 116.30 inside the araniyar river in ponneri taluk of thiruvallur district
Removal of weeds and regrading the bed portion and cleaning of flood inlets and outlets at downstream of laxmipuram anicut from ls 114.80km to 116.30 inside the araniyar river in ponneri taluk of thiruvallur district
Read moreConstruction of p.c.c. road and r.c.c. drain in different lane at moh-godawari kumhar toli under g.m.c. ward no-43, gaya jee.
Construction of p.c.c. road and r.c.c. drain in different lane at moh-godawari kumhar toli under g.m.c. ward no-43, gaya jee.
Read moreConstruction of p.c.c. road and r.c.c. drain in different lane at moh-godawari bhairo asthan under g.m.c. ward no-43, gaya jee.
Construction of p.c.c. road and r.c.c. drain in different lane at moh-godawari bhairo asthan under g.m.c. ward no-43, gaya jee.
Read moreImprovement of passage and drainage system at ambalal chawl no b dr. annie besant road in beat no.197 in g/south ward.
Improvement of passage and drainage system at ambalal chawl no b dr. annie besant road in beat no.197 in g/south ward.
Read moreConstruction of r.c.c. drain and p.c.c. road from h/o-sayara tailor to primary school in gali no-02 and road no-02 and other lane at moh-old karimganj under g.m.c. ward no-25, gayaji.
Construction of r.c.c. drain and p.c.c. road from h/o-sayara tailor to primary school in gali no-02 and road no-02 and other lane at moh-old karimganj under g.m.c. ward no-25, gayaji.
Read moreRepair renovation painting white washing providing and fixing repair of sanitary works complete in all respect at hsvp staff qtr. no. 5 b f.f in vill. abheypur in ia ph i panchkula
Repair renovation painting white washing providing and fixing repair of sanitary works complete in all respect at hsvp staff qtr. no. 5 b f.f in vill. abheypur in ia ph i panchkula
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreof your Industry type