Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Development Of Roads Upto 2nd Stage Along With Footpath In Sector 52 To 55 Under 12.5 (Percent) Scheme At Dronagiri Node.
|
| Description |
Development Of Roads Upto 2nd Stage Along With Footpath&Amp#X0d
In Sector 52 To 55 Under 12.5 &Amp#X0d
(Percent) Scheme At Dronagiri Node.
|
| Organisation | City and Industrial Development Corporation of Maharashtra Ltd | State Govt. and UT |
| Tender Id | 2026_CIDCO_1290326_1 |
|
Reference Number |
CA09/CIDCO/EE(Dron-I)/2025-26 |
| Tender Fee | 30000 |
| EMD | 18.81 Lakh |
| Tender Value | - |
| Place | CIDCO LTD |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2218179 |
| Start Date | March 25, 2026 22:30 |
| End Date |
Expired
10/04/2026
Expired 145 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Area levelling in sector -44 and 62 under 12.5 (percent) scheme and sector -42 near uran railway station at dronagiri node.
Area levelling in sector -44 and 62 under 12.5 (percent)scheme&#x0d and sector -42 near uran railway station at dronagiri node.
Read moreDesign and construction of bridges at two locations connecting sector - 55 , 56 and sector -51 , 52 at dronagiri node, navi mumbai.
Design and construction of bridges at two locations connecting sector - 55 , 56 and sector -51 , 52 at dronagiri node, navi mumbai.
Read moreReinstatement of trenches to road network due to repairs to water supply network in sector - 52 to 55 at dronagiri node.
Reinstatement of trenches to road network due to&#x0d repairs to water supply network in sector - 52 to&#x0d 55 at dronagiri node.
Read moreComprehensive maintenance for road network in sectors - 52, 53, 54 and 55 for the time period of two years at dronagiri node.
Comprehensive maintenance for road network in sectors - 52, 53, 54 and 55 for the time period of two years at dronagiri node.
Read moreReinstatement of trenches for road network due to mgl connection in sector 47 to 55 at dronagiri node.
Reinstatement of trenches for road network due&#x0d to mgl connection in sector 47 to 55 at dronagiri node.
Read moreReclamation work for proposed stp plot for jnpa 12.50(percent) scheme near dastan phata in dronagiri node, navi mumbai
Reclamation work for proposed stp plot for jnpa 12.50(percent) scheme near dastan phata in dronagiri node,&#x0d navi mumbai
Read moreConstruction of balance infrastructure work infront of plot no. 33a, 33b and 51 to 55 in sector 47 at dronagiri node
Construction of balance infrastructure work infront of plot no.33 a, 33 b and 51 to 55 in sector 47 at dronagiri node.
Read moreDevelopment of balance infrastructure infront of plot no. 1, 12 and 13 in sector - 59 under 12.5 (percent) scheme at dronagiri.
Development of balance infrastructure infront of plot&#x0d no. 1, 12 and 13 in sector - 59 under 12.5 (percent) scheme at&#x0d dronagiri.
Read moreDevelopment of stage-ii roads in sector 15 and 24m wide approach road to panje along with foothpath at dronagiri, navi mumbai
Development of stage-ii roads in sector 15 and 24m wide approach road to panje along with foothpath at dronagiri, navi mumbai
Read moreBalance integrated works including road works (upto stage-i), water supply, sewer line and s.w.drains for 22.5 percent scheme in sector 26 and 26a at pushpak node, navi mumbai under nmia project.
Balance integrated works including road works (upto stage-i), water supply, sewer lines and s. w. drains for 22.5 percent scheme in sector 26 and 26a at pushpak node, navi mumbai under nmia project.
Read moreof your Industry type