Tender Details

Particulars Details
Title
Strengthening/Improvement Including Regular Maintenance Work From The Ch. Km 69.200 To 120.200 Of The Project Two Lane With Paved Shoulders Configuration In Jowai Meghalaya Assam Border Section Of Nh 44 From Km 69.200 To Km 173.200 (Design Ch 171.455
Description
Strengthening/Improvement Including Regular Maintenance Work From The Ch. Km 69.200 To 120.200 Of The Project Two Lane With Paved Shoulders Configuration In Jowai Meghalaya Assam Border Section Of Nh 44 From Km 69.200 To Km 173.200 (Design Ch 171.455
Organisation Central Public Procurement Portal 2
Tender Id 2023_NHAI_170507_1
Reference
Number
NHAI/ROGHY/SHL/2023/JR2
Tender Fee 20000
EMD 77.82 Lakh
Tender Value
Place NHAI RO GHY
Link https://etenders.gov.in
Start Date October 12, 2023 00:15
End Date

10/11/2023 ( Expired 554 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Read more
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Read more
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Read more
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Read more
Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).

Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).

Read more
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)

Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)

Read more
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)

Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise