Tender Details
Particulars | Details |
---|---|
Title |
Consultancy Services For Feasibility Study Detailed Project Report Survey And Preparation Of Land Plan For Upgradation Of Nh69 To Four Lane From Chikkaballapur To Mulbagal Ie From Km 401 300 To 483 591 Including Realignment For Chikkaballapurtown Ie
|
Description |
Consultancy Services For Feasibility Study Detailed Project Report Survey And Preparation Of Land Plan For Upgradation Of Nh69 To Four Lane From Chikkaballapur To Mulbagal Ie From Km 401 300 To 483 591 Including Realignment For Chikkaballapurtown Ie
|
Organisation | Central Public Procurement Portal 1 |
Tender Id | 2023_MoRTH_781769_1 |
Reference Number |
RW/BNG/NH-69/Consulatncy /Km.401-483/78/2023 |
Tender Fee | 5900 |
EMD | 3.3 Lakh |
Tender Value | 1 |
Place | Regional office , MORTH, Bengaluru |
Link | https://eprocure.gov.in |
Start Date | November 20, 2023 19:00 |
End Date |
11/01/2024 ( Expired 506 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for the preparation of detailed project report (dpr) for the four lane bypass of nh stretch from km 44/600 to km 56/600 (thamarassery ghat) of nh-766 in the state of kerala.
Consultancy services for the preparation of detailed project report (dpr) for the four lane bypass of nh
 stretch from km 44/600 to km 56/600 (thamarassery ghat) of nh-766 in the state of kerala.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.
Read moreRfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Read moreConsultancy services for preparation of feasibility report cum detail engineering report for construction of four lane road km. 275-000 to 313-000 of nh 927a ing from near mohan colony chauhara, banswara to danpur upto rajasthan-mp border
Consultancy services for preparation of feasibility report cum detail engineering report for construction of four lane road km. 275-000 to 313-000 of nh 927a ing from near mohan colony chauhara, banswara to danpur upto rajasthan-mp border
Read moreConsultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Consultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Read moreConsultancy service for survey investigation and preparation of dpr for strengthening of 4-lane road with culvert from nh27 anta to siswali tiraha odr15 and 2 lane rob construction work at km 37/111 lc21 aspl of mangrol antasangod road (sh-51a)
Consultancy service for survey investigation and preparation of dpr for strengthening of 4-lane road with culvert from nh27 anta to siswali tiraha odr15 and 2 lane rob construction work at km 37/111 lc21 aspl of mangrol antasangod road (sh-51a)
Read moreConsultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Read moreConsultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Read moreConsultancy services for supervision consultant for o-m of four lane rohtak-bawal section of nh-352 (old nh- 71) from km. 363.300 (intersection with nh-09) to km. 446.955 (intersection with nh-48) in the state of haryana d on dbfot mode.
Consultancy services for supervision consultant for o-m of four lane rohtak-bawal section of nh-352 (old nh- 71) from km. 363.300 (intersection with nh-09) to km. 446.955 (intersection with nh-48) in the state of haryana d on dbfot mode.
Read moreConsultancy services for preparation of detailed project report to widening from 2lane to 4lane of reach from km 1/5 to 3/7 under long term rectification of black spots (id tg-02-205 and tg-05-181)on khammam -aswaraopeta section of nh365bb (2nd call)
Consultancy services for preparation of detailed project report to widening from 2lane to 4lane of reach from km 1/5 to 3/7 under long term rectification of black spots (id tg-02-205 and tg-05-181)on khammam -aswaraopeta section of nh365bb (2nd cal
Read moreof your Industry type