Tender Details

Particulars Details
Title
Provision Of Sub Main Wiring For Installation Ups Input/Output Connection Along With Power Plug Point In The Various Location In The Sart Building And Installation Of 40 Kva Ups Along With Suitable Distribution System At Entire Old Block Of Hss Dept.
Description
Provision Of Sub Main Wiring For Installation Ups Input/Output Connection Along With Power Plug Point In The Various Location In The Sart Building And Installation Of 40 Kva Ups Along With Suitable Distribution System At Entire Old Block Of Hss Dept.
Organisation Indian Institute of Technology Guwahati | Central Govt. Ministry/Department
Tender Id 2025_IITG_856148_1
Reference
Number
IITG/IPM/NIT/C/2024-25/75
Tender Fee 0
EMD 20000
Tender Value
Place IIT GUWAHATI
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=900121
Start Date April 09, 2025 19:30
End Date

21/04/2025 ( Expired 20 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Laying rising main and delivery main connection along with laying of new upvc/di pipeline for interconnection in the distribution system and bridge/culvert crossing and other allied works for nararthali pwss adjacent to purba narathali wss

Laying rising main and delivery main connection along with laying of new upvc/di pipeline for interconnection in the distribution system and bridge/culvert crossing and other allied works for nararthali pwss adjacent to purba narathali wss

Read more
Provision of sub-main wiring for installation ups input/output connection along with power plug point in the various location in the sart building and installation of 40kva ups along with suitable distribution system at entire old block of hss dept.

Provision of sub-main wiring for installation ups input/output connection along with power plug point in the various location in the sart building and installation of 40kva ups along with suitable distribution system at entire old block of hss dept.

Read more
Work of installation of 01 new tube well of 35 hp capacity in ward-32 moh rampur garden along with construction of pump house, electrical connection, laying of rising main line and other related works.

Work of installation of 01 new tube well of 35 hp capacity in ward-32 moh rampur garden along with construction of pump house, electrical connection, laying of rising main line and other related works.

Read more
Work of installation of 01 new tube well of 35 hp capacity in ward-06 nawada shekhan along with construction of pump house, electrical connection, laying of rising main line and other related works.

Work of installation of 01 new tube well of 35 hp capacity in ward-06 nawada shekhan along with construction of pump house, electrical connection, laying of rising main line and other related works.

Read more
Electrical installation, wiring, illumination, power point, light and fan point works in the rapid solidification lab, welding lab, mmd division and lt-1 of dept. of metallurgical engg., iit(bhu), varanasi

Electrical installation, wiring, illumination, power point, light and fan point works in the rapid solidification lab, welding lab, mmd division and lt-1 of dept. of metallurgical engg., iit(bhu), varanasi

Read more
Supply, delivery and installation of u type hot rolled steel sheet pile along with other ancillary works in connection with shore protection against massive erosion to save century old igwtp of the kolkata municipal corporation (kmc)

Supply, delivery and installation of u type hot rolled steel sheet pile along with other ancillary works in connection with shore protection against massive erosion to save century old igwtp of the kolkata municipal corporation (kmc)

Read more
Electrical installation, wiring, illumination, power point, light and fan point works in room-43 and lab-18 (machine room) in the dept. of pharmaceutical engg., iit(bhu), varanasi.

Electrical installation, wiring, illumination, power point, light and fan point works in room-43 and lab-18 (machine room) in the dept. of pharmaceutical engg., iit(bhu), varanasi.

Read more
Replacement of damaged ei wiring, ups wiring, networking with new wiring along with provision of new energy saving fans, led fittings in post office at soraon po under prayagraj division, prayagraj

Replacement of damaged ei wiring, ups wiring, networking with new wiring along with provision of new energy saving fans, led fittings in post office at soraon po under prayagraj division, prayagraj

Read more
Electrical installation, wiring, illumination, power point, light and fan point works in the research laboratory-21 of pharmaceutical engg. dept., iit(bhu), varanasi.

Electrical installation, wiring, illumination, power point, light and fan point works in the research laboratory-21 of pharmaceutical engg. dept., iit(bhu), varanasi.

Read more
Work of installation of 01 new tube well of 35 hp capacity in ward-06 nawada shekhan along with construction of pump house, electrical connection, laying of rising main line and other related works.

Work of installation of 01 new tube well of 35 hp capacity in ward-06 nawada shekhan along with construction of pump house, electrical connection, laying of rising main line and other related works.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise