Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Gps Device Per Day With Instalation,Gps Device Per Day With Instalation 2,Gps Device Per Day With I
|
| Description |
|
| Organisation | NA | Election Commission of India |
| Tender Id | GEM/2024/B/4436306 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 04, 2024 22:26 |
| End Date |
Expired
15/01/2024
Expired 975 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | KAVYA EDUCATIONAL WELFARE SOCIETY | - | 19-01-2024 14:39:20 | N/A | Disqualified |
| 2 | REEF TECHNOLOGIES | - | 10-01-2024 13:51:15 | MII MSE | Qualified |
| 3 | Shiva Traders | - | 18-01-2024 22:02:33 | MII MSE | Qualified |
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Read more2nd call suryapet district - package-i : construction of tahsildar (mro) office buildings at kodad mandal and 2. maddirala mandal 3. mothey mandal
2nd call suryapet district - package-i : construction of tahsildar (mro) office buildings at kodad mandal and 2. maddirala mandal 3. mothey mandal
Read moreHiring of 2wd tyre mounted loader (backhoe) for 12 hrs availability, 250 hrs per month for a period of 2 years for rgoc-2
Hiring of 2wd tyre mounted loader (backhoe) for 12 hrs availability, 250 hrs per month for a period of 2 years for rgoc-2
Read more2nd call sangareddy district - package-i: 1) construction of tahsildar (mro) office buildings at mogudampalli mandal, 2) jinnaram mandal and 3) munipally mandal
2nd call sangareddy district - package-i: 1) construction of tahsildar (mro) office buildings at mogudampalli mandal, 2) jinnaram mandal and 3) munipally mandal
Read more2nd call wanaparthy district - package-i : construction of tahsildar (mro) office buildings at 1. athmakur mandal 2.revally mandal and 3.chinnambavi mandal
2nd call wanaparthy district - package-i : construction of tahsildar (mro) office buildings at 1. athmakur mandal 2.revally mandal and 3.chinnambavi mandal
Read moreRepair and retrofitting of 300 kld plant with mbbr technology including all necessary items including 2 year operation and maintenance at 2 bhk, balasamudram, hanamkonda (2nd call)
Repair and retrofitting of 300 kld plant with mbbr technology including all necessary items including 2 year operation and maintenance at 2 bhk, balasamudram, hanamkonda (2nd call)
Read moreProvn of flooring with interlocking tiles under veh repair shed at fri of 31 rr cdo bn under age br i of ge 865 ews leh
Provn of flooring with interlocking tiles under veh repair shed at fri of 31 rr cdo bn under age br i of ge 865 ews leh
Read more2nd call mancherial district - package-i: 1) construction of rdo office building at mancherial mandal ,2) construction of tahsildar (mro) office buildings at dandepalli mandal and 3) kothapalli mandal
2nd call mancherial district - package-i: 1) construction of rdo office building at mancherial mandal ,2) construction of tahsildar (mro) office buildings at dandepalli mandal and 3) kothapalli mandal
Read moreConstruction of bridge / hlb on i) allapur to arutla x-road (via) thumbai thanda, kadilabavi thanda at km 1/6-8, km 3/8-10, km 6/4-6, ii) gudi malkapur to chelmada (via) kothulapuram, survail, lingamvari gudem, saigoni bavi at km 3/4-6, km 4/0-2, km 4/4-6, km 5/6-8, km 7/8-10, km 9/0-2, km 9/2-4, km 10/8-10, km 11/2-4, km 12/2-4, iii) lachammagudem to anthampet at km 2/8-10, survail to palivela (via) mallareddy gudem at km 6/2-4, km 7/0-2, km 7/4-6, km 8/8-10 (2 nos), km 11/0-2, km 11/6-8, iv) n
Construction of bridge / hlb on i) allapur to arutla x-road (via) thumbai thanda, kadilabavi thanda at km 1/6-8, km 3/8-10, km 6/4-6, ii) gudi malkapur to chelmada (via) kothulapuram, survail, lingamvari gudem, saigoni bavi at km 3/4-6, km 4/0-2, km 4/4-6, km 5/6-8, km 7/8-10, km 9/0-2, km 9/2-4, km 10/8-10, km 11/2-4, km 12/2-4, iii) lachammagudem to anthampet at km 2/8-10, survail to palivela (via) mallareddy gudem at km 6/2-4, km 7/0-2, km 7/4-6, km 8/8-10 (2 nos), km 11/0-2, km 11/6-8, iv) nh-65 to narayanpur (via) koyalagudem, d.nagaram, peepalpahad, allapur, venkambai thanda at km 3/0-2, km 3/8-10, km 8/2-4, km 10/2-4, km 11/0-2, km 16/0-2 in yadadri-bhongir district.
Read moreSewerage projects in 30 ulbs under sbm 2.0 under the jurisdiction of adilabad, karimnagar and warangal ph divisions (package-i) under ls contract system with hybrid annuity model
Sewerage projects in 30 ulbs under sbm 2.0 under the jurisdiction of adilabad, karimnagar and warangal ph divisions (package-i) under ls contract system with hybrid annuity model
Read moreof your Industry type