🏭 Bokaro Power Supply Company (P) Limited Seeks Assistance In Material Handling 📦🔧 Bokaro Power Supply Company (P) Limited, A Public Sector Undertaking, Is Calling For Bids To Provide Assistance In Material Handling Within Its Planning Cell At The Power Plant Located In Bokaro Steel City. 📅 Bid Submission Deadline: June 27, 2024, 12:00 Pm The Tender Fee Is Set At Inr 15,000. Interested Bidders Should Offer Comprehensive Solutions For Efficient Material Handling, Including Equipment, Maintenance, And Operational Support. Proposals Must Demonstrate An Understanding Of The Unique Operational Requirements Of A Power Plant Environment. Keywords: Bokaro Power Supply Company, Material Handling, Planning Cell, Public Sector Undertaking, Tender, Bid Assistance| Particulars | Details |
|---|---|
| Title |
Assistance In Material Handling In Planning Cell
|
| Description |
Assistance In Material Handling In Planning Cell
|
| Organisation | Bokaro Power Supply Company (P) Limited | Public Sector Undertakings |
| Tender Id | 2024_BPSCL_196734_1 |
|
Reference Number |
23-24/C-232/NIT-015 |
| Tender Fee | 0 |
| EMD | 15000 |
| Tender Value | - |
| Place | Power Plant, BPSCL, BOKARO STEEL CITY |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=215254 |
| Start Date | May 28, 2024 23:00 |
| End Date |
Expired
27/06/2024
Expired 830 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDate: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Read moreStmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreConsultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreAssistance in material handling in planning cell
Assistance in material handling in planning cell
Read moreAssistance in material handling in planning cell.
Assistance in material handling in planning cell.
Read moreAssistance in material handling documentation cell and piping works of project inrp tarapur
Assistance in material handling documentation cell and piping works of project inrp tarapur