Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Power Cable 4 Core 4 Sqmm,Power Cable 4 Core 10 Sqmm,Ups 5 Kva With 30 Min Backup 1 Phase In And 1
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | July 02, 2025 19:58 |
End Date |
23/07/2025 ( 20 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreStrengthening of banur tepla road via surat manouli road (odr-42) in distt. sas nagar with 5 year maintenance (1 year defect liability period under head 5054 rb-10 roads)
Strengthening of banur tepla road via surat manouli road (odr-42) in distt. sas nagar with 5 year maintenance (1 year defect liability period under head 5054 rb-10 roads)
Read moreDes, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.
Des, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.
Read moreManufacturing testing supply erection and commissioning of 1 no 33 by 11 kv 5 mva 3 phase power transformer at shanan ph pspcl
Manufacturing testing supply erection and commissioning of 1 no 33 by 11 kv 5 mva 3 phase power transformer at shanan ph pspcl
Read moreProvision of 3 phase power supply, lightening arrestors, 75 kva voltage stabilizer, fire alarm and smoke detection system, nato sockets in tech area of afs bidar
Provision of 3 phase power supply, lightening arrestors, 75 kva voltage stabilizer, fire alarm and smoke detection system, nato sockets in tech area of afs bidar
Read morePower cable 4 core 4 sqmm,power cable 4 core 10 sqmm,ups 5 kva with 30 min backup 1 phase in and 1
Read more
Strenthening of bahadurgarh seel ghanour shambhu road (podr-35) rd 7.00 to 12.00 and 15.00 to 21.00 in distt. patiala with 5 year maintenance (1 year defect liability period) under head 5054 rb-10 roads
Strenthening of bahadurgarh seel ghanour shambhu road (podr-35) rd 7.00 to 12.00 and 15.00 to 21.00 in distt. patiala with 5 year maintenance (1 year defect liability period) under head 5054 rb-10 roads
Read moreStrengthening of zirakpur dhakauli road (podr-02) in distt. sas nagar with 5 year maintenance (1 year defect liability period) under head 5054 rb-10 roads
Strengthening of zirakpur dhakauli road (podr-02) in distt. sas nagar with 5 year maintenance (1 year defect liability period) under head 5054 rb-10 roads
Read moreStrengthening of bahadurgarh ghanour road to ghanour via chappar manjoli (odr-37) in distt. sas nagar with 5 year maintenance (1 year defect liability period) under head 5054 rb-10 roads
Strengthening of bahadurgarh ghanour road to ghanour via chappar manjoli (odr-37) in distt. sas nagar with 5 year maintenance (1 year defect liability period) under head 5054 rb-10 roads
Read moreSpecial repair of pump chambers including development of water works area construction of pathways and other related works in urban estate phase 1 2 3 and 4 patiala
Special repair of pump chambers including development of water works area construction of pathways and other related works in urban estate phase 1 2 3 and 4 patiala
Read moreof your Industry type