Tender Details

Particulars Details
Title
Laying Of 8 Inch(200mm) Diameter Pipeline (Approx 700m) Before Upcoming Monsoon For Mine Dewatering At Old Potanga Quarry Under Urimari Ocp.
Description
Laying Of 8 Inch(200mm) Diameter Pipeline (Approx 700m) Before Upcoming Monsoon For Mine Dewatering At Old Potanga Quarry Under Urimari Ocp.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 8200
Tender Value
Place Urimari OCP
Link

AAAAAAAAAA

Login to view
Start Date April 22, 2025 14:30
End Date

02/05/2025 ( 9 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
For the financial year 2025-26 rod / ring repair (making) of sluice valve of 3 inch, 4 inch, 5 inch, 6 inch, 8 inch, 10 inch, 12 inch pipeline located at different places of the city

For the financial year 2025-26 rod / ring repair (making) of sluice valve of 3 inch, 4 inch, 5 inch, 6 inch, 8 inch, 10 inch, 12 inch pipeline located at different places of the city

Read more
Lowering and lifting and installation of pump with alignment of pipe 150mm and 200mm dia ms/gi pipeline at karma ocp under kuju area.

Lowering and lifting and installation of pump with alignment of pipe 150mm and 200mm dia ms/gi pipeline at karma ocp under kuju area.

Read more
Pump shifitng, lowering and installation of 150mm and 200 mm dia ms/gi pipeline works at topa ocp mine under kuju area.

Pump shifitng, lowering and installation of 150mm and 200 mm dia ms/gi pipeline works at topa ocp mine under kuju area.

Read more
Dismantle, shifting, extension and maintenance of 200 mm and 150mm dia gi pipeline for monsoon preparation at karma ocp under kuju area.

Dismantle, shifting, extension and maintenance of 200 mm and 150mm dia gi pipeline for monsoon preparation at karma ocp under kuju area.

Read more
Laying of 8 inch(200mm) diameter pipeline (approx 700m) before upcoming monsoon for mine dewatering at old potanga quarry under urimari ocp.

Laying of 8 inch(200mm) diameter pipeline (approx 700m) before upcoming monsoon for mine dewatering at old potanga quarry under urimari ocp.

Read more
Repairing of 04 nos. 3.3kv ht motor and rotor of potanga quarry under urimari ocp.

Repairing of 04 nos. 3.3kv ht motor and rotor of potanga quarry under urimari ocp.

Read more
Laying and fixing of m.s/g.i. pipelines of nominal dia. 6inch, 8inch and 10inch for dewatering monsoon water from sumps of sec.i n sec.ii patches at mines of rajrappa project

Laying and fixing of m.s/g.i. pipelines of nominal dia. 6inch, 8inch and 10inch for dewatering monsoon water from sumps of sec.i n sec.ii patches at mines of rajrappa project.

Read more
Rearrangement of 6 inch and 4

Rearrangement of 6 inch and 4 &#x0d inch pipeline in old sump for &#x0d monsoon preparation at tsocp &#x0d under hazaribagh area

Read more
Nit 21 construction and commissioning of 2 nos of 200mm dia tubewells and replacement of old an wornout pump machinery for strengthening of existing water supply system at uwss kotputali under summer contingency-2025 with 24 months defective liabili

Nit 21 construction and commissioning of 2 nos of 200mm dia tubewells and replacement of old an wornout pump machinery for strengthening of existing water supply system at uwss kotputali under summer contingency-2025 with 24 months defective liabili

Read more
Laying of 300 meters of 150 mm diameter pipeline along with pipe fittings for installation of pump in 2nd patch of east quarry for dewatering at sayald project.

Laying of 300 meters of 150 mm diameter pipeline along with pipe fittings for installation of pump in 2nd patch of east quarry for dewatering at sayald project.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise