Tender Details
Particulars | Details |
---|---|
Title |
Laying Of 6 Inch(150mm) Diameter Pipeline (Approx 400m) For Mine Dewatering At New Patch Of Potanga Quarry Under Urimari Ocp.
|
Description |
Laying Of 6 Inch(150mm) Diameter Pipeline (Approx 400m) For Mine Dewatering At New Patch Of Potanga Quarry Under Urimari Ocp.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_334524_1 |
Reference Number |
PE(EnM)/Urimari/e Tender/25-26/08 |
Tender Fee | 0 |
EMD | 6100 |
Tender Value | |
Place | Urimari OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=346783 |
Start Date | April 25, 2025 14:30 |
End Date |
05/05/2025 ( Expired 30 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreShifting, di, extension of pipeline arrangement for lower kusmunda-1 (lk-1) and lower kusmunda-2 (lk-2) quarry sumps by laying and jointing of pipeline for dewatering purposes along with making of bends of sizes 12/10/8/6/4 inches at dep.
Shifting, di, extension of pipeline arrangement for lower kusmunda-1 (lk-1) and lower kusmunda-2 (lk-2) quarry sumps by laying and jointing of pipeline for dewatering purposes along with making of bends of sizes 12/10/8/6/4 inches at dep.
Read moreSitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Read moreAAAAAAAAAA
Login to viewEmergent flank repairing work for laying of pipeline by phe deptt. from ch. 13.00 kmp to ch. 14.50 kmp at jagatpur-dharampota road under hooghly construction sub-division-ii, arambagh, pwd, under hooghly construction division, pwd.
Read moreTransporting and laying of 240 meter of hdpe 8 inch /ms pipes 6 inch vertical delivery range of patch b and making of 6 nos. of bends for installation of additional 600 gpm 550v pump at east bassuriya colliery
Transporting and laying of 240 meter of hdpe 8 inch /ms pipes 6 inch vertical delivery range of patch b and making of 6 nos. of bends for installation of additional 600 gpm 550v pump at east bassuriya colliery
Read moreErection of lighting line for mine lighting purposes near kusunda area, kari jor river and at coal dump haul road near till new view point at dhansar ocp, kusunda area
Erection of lighting line for mine lighting purposes near kusunda area, kari jor river and at coal dump haul road near till new view point at dhansar ocp, kusunda area
Read moreTransportation and installation of 1000 gpm pump with motor at 124l/8d to132l/02d including laying and fitting of 6 inch diameter pipe line from 132l/02d to 123l/7d and connecting with existing pipe line for borehole at 110l.laying and installation
Transportation and installation of 1000 gpm pump with motor at 124l/8d to132l/02d including laying and fitting of 6 inch diameter pipe line from 132l/02d to 123l/7d and connecting with existing pipe line for borehole at 110l.laying and installation
Read moreLabour charges for dismantling and laying and jointing of 200mm dia ms pipeline in the quarry area of oc-iv section of pkoc, for one year period in manuguru area i.e., 2025-26, bhadradri kothagudem district, telangana. ( invited under earmarked works - sccl registered contractors belong to sc community are eligible to participate)
Labour charges for dismantling and laying and jointing of 200mm dia ms pipeline in the quarry area of oc-iv section of pkoc, for one year period in manuguru area i.e., 2025-26, bhadradri kothagudem district, telangana. ( invited under earmarked works - sccl registered contractors belong to sc community are eligible to participate)
Read moreConstruction of foundation/ plate from for 06 nos ht pump (1000gpm) and 06 nos ht pump (1500gpm) and 6 nos lt pumps and laying of haulage track line for shifting of above said pumps in ug at khairaha ug mine
Construction of foundation/ platefrom for 06 nos ht pump (1000gpm) and 06 nos ht pump (1500gpm) and 6 nos lt pumps and laying of haulage track line for shifting of above said pumps in ug at khairaha ug mine
Read moreDismantling of broken stowing pipeline and lowering and fitting of 17 nos of 6 inch dia seamless pipe for bunker no 25 for the purpose of sand stowing in depillaring district nk33 (a) in pit no 7 in rvii narainkuri seam, amkola unit under nimcha
Dismantling of broken stowing pipeline and lowering and fitting of 17 nos of 6 inch dia seamless pipe for bunker no 25 for the purpose of sand stowing in depillaring district nk33 (a) in pit no 7 in rvii narainkuri seam, amkola unit under nimcha
Read moreof your Industry type