Tender Details

Particulars Details
Title
Fabrication And Erection Of Pontoon At Old Potanga Quarry For Dewatering Purpose Under Urimari Ocp
Description
Fabrication And Erection Of Pontoon For Installation Of Pump&#X0d 2000/1000 Gpm Discharge At Old Potanga Quarry For&#X0d Dewatering Purpose Under&#X0d Urimari Ocp.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_337819_1
Reference
Number
PE(EnM)/Urimari/e Tender/25-26/15
Tender Fee 0
EMD 18400
Tender Value -
Place Urimari OCP
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=350202

Start Date June 19, 2025 14:30
End Date
Expired 28/06/2025

Expired 473 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit contract for replacement of old corroded i beam structure damaged gi gratings along with supporting members by fabrication erection of new i beam structur..

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit contract for replacement of old corroded i beam structure damaged gi gratings along with supporting members by fabrication erection of new i beam structur..

Read more
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any

Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any

Read more
Erection of ht 3.3kv oh line at new patch of potanga quarry under urimari ocp.

Erection of ht 3.3kv oh line at new patch of potanga quarry&#x0d under urimari ocp.

Read more
Laying of 8 inch(200mm) diameter pipeline (approx 700m) before upcoming monsoon for mine dewatering at old potanga quarry under urimari ocp.

Laying of 8 inch(200mm) diameter pipeline (approx 700m) before upcoming monsoon for mine dewatering at old potanga quarry under urimari ocp.

Read more
Erection/ laying of 200mm (8 inch) diameter ms/gi pipe line from old potanga quarry to bhurkundwa nala under urimari ocp.

Erection/ laying of 200mm (8 inch) diameter ms/gi pipe line from old potanga quarry to bhurkundwa nala under urimari ocp.

Read more
Laying of 200mm and 150mm diameter pipeline before upcoming monsoon for mine dewatering at potanga quarry under urimari ocp.

Laying of 200mm &#x0d and 150mm &#x0d diameter pipeline &#x0d before upcoming &#x0d monsoon for mine &#x0d dewatering at potanga quarry under urimari ocp.

Read more
Erection and dismantling of ht (3.3kv) overhead line at potanga quarry for one year (365 days) under urimari ocp

Erection and dismantling of ht (3.3kv) overhead line at potanga quarry on as and when required basis for a period of one year (365 days) under&#x0d urimari ocp.

Read more
Laying of 6 inch(150mm) diameter pipeline (approx 400m) for mine dewatering at new patch of potanga quarry under urimari ocp.

Laying of 6 inch(150mm) diameter pipeline (approx 400m) for mine dewatering at new patch of potanga quarry under urimari ocp.

Read more
Repairing of 04 nos. 3.3kv ht motor and rotor of potanga quarry under urimari ocp.

Repairing of 04 nos. 3.3kv ht motor and rotor of potanga quarry under urimari ocp.

Read more
Repairing of 1000 gpm, 200m head make flowmore pump installed at potanga quarry under urimari ocp.

Repairing of 1000 gpm, 200m head make flowmore pump installed at potanga quarry under urimari ocp.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise