Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fabrication And Erection Of Pontoon At Old Potanga Quarry For Dewatering Purpose Under Urimari Ocp
|
| Description |
Fabrication And Erection Of Pontoon For Installation Of Pump
2000/1000 Gpm Discharge At Old Potanga Quarry For
Dewatering Purpose Under
Urimari Ocp.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_337819_1 |
|
Reference Number |
PE(EnM)/Urimari/e Tender/25-26/15 |
| Tender Fee | 0 |
| EMD | 18400 |
| Tender Value | - |
| Place | Urimari OCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=350202 |
| Start Date | June 19, 2025 14:30 |
| End Date |
Expired
28/06/2025
Expired 473 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit contract for replacement of old corroded i beam structure damaged gi gratings along with supporting members by fabrication erection of new i beam structur..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit contract for replacement of old corroded i beam structure damaged gi gratings along with supporting members by fabrication erection of new i beam structur..
Read moreMobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreErection of ht 3.3kv oh line at new patch of potanga quarry under urimari ocp.
Erection of ht 3.3kv oh line at new patch of potanga quarry
 under urimari ocp.
Read moreLaying of 8 inch(200mm) diameter pipeline (approx 700m) before upcoming monsoon for mine dewatering at old potanga quarry under urimari ocp.
Laying of 8 inch(200mm) diameter pipeline (approx 700m) before upcoming monsoon for mine dewatering at old potanga quarry under urimari ocp.
Read moreErection/ laying of 200mm (8 inch) diameter ms/gi pipe line from old potanga quarry to bhurkundwa nala under urimari ocp.
Erection/ laying of 200mm (8 inch) diameter ms/gi pipe line from old potanga quarry to bhurkundwa nala under urimari ocp.
Read moreLaying of 200mm and 150mm diameter pipeline before upcoming monsoon for mine dewatering at potanga quarry under urimari ocp.
Laying of 200mm 
 and 150mm 
 diameter pipeline 
 before upcoming 
 monsoon for mine 
 dewatering at potanga quarry under urimari ocp.
Read moreErection and dismantling of ht (3.3kv) overhead line at potanga quarry for one year (365 days) under urimari ocp
Erection and dismantling of ht (3.3kv) overhead line at potanga quarry on as and when required basis for a period of one year (365 days) under
 urimari ocp.
Read moreLaying of 6 inch(150mm) diameter pipeline (approx 400m) for mine dewatering at new patch of potanga quarry under urimari ocp.
Laying of 6 inch(150mm) diameter pipeline (approx 400m) for mine dewatering at new patch of potanga quarry under urimari ocp.
Read moreRepairing of 04 nos. 3.3kv ht motor and rotor of potanga quarry under urimari ocp.
Repairing of 04 nos. 3.3kv ht motor and rotor of potanga quarry under urimari ocp.
Read moreRepairing of 1000 gpm, 200m head make flowmore pump installed at potanga quarry under urimari ocp.
Repairing of 1000 gpm, 200m head make flowmore pump installed at potanga quarry under urimari ocp.
Read moreof your Industry type