Tender Details
Particulars | Details |
---|---|
Title |
Redevelopment Of Laxmi Baraha Temple, Aul In The District Of Kendrapara For The Year 2023 24
|
Description |
Temple Work
|
Organisation | Government of Odisha |
Tender Id | 2023_EICCL_92965_7 |
Reference Number |
CCE.Ctc.(RandB)14/2023-24 |
Tender Fee | 10000 |
EMD | 5.37 Lakh |
Tender Value | |
Place | O/o CCE Cuttack RandB Circle |
Link | https://tendersodisha.gov.in |
Start Date | October 02, 2023 15:30 |
End Date |
12/10/2023 ( Expired 583 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Read moreMaintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre
Maintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre
Read moreE-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreConsultancy services for preparation of landslide hazard assessment and detailed project report for landslide mitigation measures across eight identified sites in kolhapur district, maharashtra
Consultancy services for preparation of landslide hazard assessment and detailed project report for landslide mitigation measures across eight identified sites in kolhapur district, maharashtra
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreSupply and installation of porcupines for additional high priority works in lakhimpur (dhakuwakhana, bonpuroi), biswanath and sonitpur districts package no. g-24, lot 4
Supply and installation of porcupines for additional high priority works in lakhimpur (dhakuwakhana, bonpuroi), biswanath and sonitpur districts package no. g-24, lot 4
Read moreRepair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.(job no br/15/as/2024-25/284).
Repair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.( job no br/15/as/2024-25/284).
Read moreConstruction work of new 51 meter long pedestrian bridge in place of the 113 year old pedestrian suspension bridge situated on the saryu river in bageshwar constituency of bageshwar district. missing link in anticipation of sanction
Construction work of new 51 meter long pedestrian bridge in place of the 113 year old pedestrian suspension bridge situated on the saryu river in bageshwar constituency of bageshwar district. missing link in anticipation of sanction
Read moreMaintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Read moreExecuting work of 66 kv line for stringing of 2nd circuit of 66 kv line from 66 kv substation amloh to 66 kv substation bhadson planning no 80 cz 2023 24 annexure e rdss work
Executing work of 66 kv line for stringing of 2nd circuit of 66 kv line from 66 kv substation amloh to 66 kv substation bhadson planning no 80 cz 2023 24 annexure e rdss work
Read moreof your Industry type