Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
765 Estimate For Bypassing The Storm Water From Main Trunkline Along With Drain No 6 In Eastern Side Of Mc Sonipat
|
| Description |
765 Estimate For Bypassing The Storm Water From Main Trunkline Along With Drain No 6 In Eastern Side Of Mc Sonipat
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2025_HRY_450888_1 |
|
Reference Number |
2025C9C0484C B008 4BF7 A657 23712E757F5D292ULB |
| Tender Fee | 6180 |
| EMD | 60000 |
| Tender Value | |
| Place | Sonepat |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=528455 |
| Start Date | June 05, 2025 23:30 |
| End Date |
Expired
13/06/2025
Expired 378 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Estimate for construction of rain water harvesting structure under ward no 21 in mc panipat
Estimate for construction of rain water harvesting structure under ward no 21 in mc panipat
Read moreReconstructions of storm water drain at brindavan circle south (s to n) in ward no 87, south zone.
Reconstructions of storm water drain at brindavan circle south (s to n) in ward no 87, south zone.
Read moreProviding storm water drain and culvert at anna nagar main road (080017r257), anna nagar north road (080017r260) and vinayagar kovil road (080017r264) ward no 17 in palani municipality
Providing storm water drain and culvert at anna nagar main road (080017r257), anna nagar north road (080017r260) and vinayagar kovil road (080017r264) ward no 17 in palani municipality
Read moreConstruction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Construction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreConstruction of interlocking road and drain from manokamna temple gate to the pond in mohammed ramlila ward no. 7 of nagar panchayat jhalhu, bijnor district. length 80.30 meters.
Construction of interlocking road and drain from manokamna temple gate to the pond in mohammed ramlila ward no. 7 of nagar panchayat jhalhu, bijnor district. length 80.30 meters.&#x0d
Read moreAnnual maintenance contract for solar based pumping unit with allied accessories installed by the phe ground water division, srinagar in different districts of kashmir valley.
Annual maintenance contract for solar based pumping unit with allied accessories installed by the phe ground water division, srinagar in different districts of kashmir valley.
Read moreComplete repairing/rewinding of 03 numbers of 10hp,550v,3phase,2900rpm submersible pump motors for ensuring smooth water supply to the residential quarters and boiler reservoir from riverside borehole, old 7 no. pit and water reservoir at madhaipur
Complete repairing/rewinding of 03 numbers of 10hp,550v,3phase,2900rpm submersible pump motors for ensuring smooth water supply to the residential quarters and boiler reservoir from riverside borehole, old 7 no. pit and water reservoir at madhaipur
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreCharter hire of 2 two nos of dp 3 drillship modu package with equipment and crew for drilling, testing and abandonment of exploratory wells in water depths from 500 meters to 3000 meters.
Charter hire of 2 two nos of dp 3 drillship modu package with equipment and crew for drilling, testing and abandonment of exploratory wells in water depths from 500 meters to 3000 meters.
Read moreof your Industry type