Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wbiw/Ctu/Ce(n)/E Nit 33(e)/ 2025 26 S.L 01
|
| Description |
Anti Erosion Work To The Right Bank Of River Padma At Aor Of Bop Atrosia And Renu For A Total Length Of 1830.00 M In Bloc Kand P.S. Lalgola, Dist. Murshidabad
|
| Organisation | IRRIGATION AND WATERWAYS DEPT. | State Govt. and UT |
| Tender Id | 2026_IWD_986578_1 |
|
Reference Number |
WBIW/CTU/CE(N)/e-NIT- 33 (e)/ 2025-26 |
| Tender Fee | 0 |
| EMD | 50 Lakh |
| Tender Value | - |
| Place | Lalgola |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2408520 |
| Start Date | January 10, 2026 22:30 |
| End Date |
Expired
02/02/2026
Expired 251 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreWbiw/ctu/ce(n)/e-nit-25(e)/ 2025-26 s.l-01
Rehabilitation work of downstream of tilpara mihirlal barrage within block-suri-i, p.s.- suri, dist. birbhum
Read moreWbiw/ctu/ce(me) /e-nit- 24 (e)/2025-26 s.l-02
Supply, installation, testing and commissioning including trial and one year successful operation and maintenance of eight (8) nos. column mounted mixed flow submersible pump of capacity 25 cusec (2550 m3/hr) (each) along with electromechanical i
Read moreWbiw/ctu/ce(n)/e-nit-01(e)/ 2025-26
Protection work along&#x0d right bank of river padma&#x0d from house of islam uddin to bsf camera post (length 500m) at radhakrishnapur within g.p.- bilborakopara,&#x0d block and p.s.- lalgola,&#x0d dist. murshidabad
Read moreWbiw/ctu/ce(n) /e-nit- 30 (e)/2025-26 sl01
Improvement of canal system of kopai south main canal of mayurakshi reservoir project from ch 1779.23 to ch 2000.92 (total working length 6.76 km) in ketugram i block of purba bardhaman district
Read moreWbiw/ctu/ce(n)/e-nit-08(e) /2025-26 sl01
Protection work along right bank of river koshi for a length of 1500.00 mtr at paschim ratanpur to save the tagging point of new ring bundh within g.p.- bilaimari , p.s.-bhutni and ratua, block- ratua-i and manikchak, dist- malda
Read moreWbiw/ctu/ce(n)/e-nit-04(e)/ 2025-26 sl01
Protection work along left bank of river ganga from manikchak ferry ghat towards upstream (ch.-29.500 km to ch.30.600 km upstream of farakka barrage) (length 1150 m) at narayanpur within block and p.s.-manikchak, dist.-malda
Read moreWbiw/ctu/ce(n)/e-nit-14(e)/ 2025-26( 2nd call)
Anti-erosion work to the right bank of river padma at aor of bop atrosia and renu for a total length of 1830.00 m in block and p.s. lalgola, dist.-murshidabad (2nd call to the 1st call bearing e-nit no. wbiw/ctu/ce(n)/e-nit-10(e)/2025-26)
Read moreWbiw/ctu/ce(n)/e-nit-10(e)/ 2025-26, sl-01
Anti-erosion work to the right bank of river padma at aor of bop atrosia and renu for a total length of 1830.00 m in block and p.s. lalgola, dist.-murshidabad
Read moreof your Industry type