Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Shifting Of 33 Kv Line From Thakur Chandrapal Singh Chairitable Block Balha Under Edd 2 Nanpara
|
Description |
Shifting Of 33 Kv Line From Thakur Chandrapal Singh Chairitable Block Balha Under Edd 2 Nanpara
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_MVVNL_835173_1 |
Reference Number |
43/EDC(B)/2023-24 |
Tender Fee | 1180 |
EMD | 2000 |
Tender Value | |
Place | 33/11 KV S/S Hospital Chauraha, Bahraich |
Link | https://etender.up.nic.in |
Start Date | September 05, 2023 22:30 |
End Date |
19/09/2023 ( Expired 652 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Modification / shifting of 220 kv bamnauli-dial overhead, double circuit transmission line infringing to new proposed track at bijwasan railway station on turnkey basis.
Modification / shifting of 220 kv bamnauli-dial overhead, double circuit transmission line infringing to new proposed track at bijwasan railway station on turnkey basis.
Read more2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreConstruction of 2 nos. of 132 kv gss besroli and thanwala along with associated lines and bays under bn-9016002506
Construction of 2 nos. of 132 kv gss besroli and thanwala along with associated lines and bays under bn-9016002506
Read moreRenovation of gravelling work by providing concrete base including other miscellaneous work at 132/ 33 kv switch yards of ramgarh sub-station (phase- ii) and west bokaro receiving sub-station under gomd-vii, dvc, ramgarh
Renovation of gravelling work by providing concrete base including other miscellaneous work at 132/ 33 kv switch yards of ramgarh sub-station (phase- ii) and west bokaro receiving sub-station under gomd-vii, dvc, ramgarh
Read moreConstruction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Read moreSubstation package: ss-02 (i) 02 nos. of 400 kv line bays at 765/400/220 kv bikaner-iii ps for interconnection of 1400mw rppd of m/s sunbreeze renewables nine pvt. ltd. (sr9pl) (2 nos. bays).
765/400/220 kv ais extension package - substation package: ss-02 (i) 02 nos. of 400 kv line bays at 765/400/220 kv bikaner-iii ps for interconnection of 1400mw rppd of m/s sunbreeze renewables nine pvt. ltd. (sr9pl) (2 nos. bays).
Read moreConstruction of boundary wall around of green belt situated from scheme no. 78 part -2 house no. 136 advance national academy school to hotel 10-11 grand under ward no. 32 zone no.07
Construction of boundary wall around of green belt situated from scheme no. 78 part -2 house no. 136 advance national academy school to hotel 10-11 grand under ward no. 32 zone no.07
Read moreInstallation and re-fixing of new paver block, inserting of beem, maintenance and other civil work of kalika garden situated at scheme no. 136 a-2 under ward no. 34 zone no.07
Installation and re-fixing of new paver block, inserting of beem, maintenance and other civil work of kalika garden situated at scheme no. 136 a-2 under ward no. 34 zone no.07
Read moreof your Industry type