| Particulars | Details |
|---|---|
| Title |
Dismantling Of Old Over Head Maintenance Beams (Joist) At Ps 5 Main Washing Plant N Ps8 N 9 N Fabrication, Erection N Alignment, Of The Same After Providing Extra Supports For Strengthening Of Structure At Rajrappa Washery Project
|
| Description |
Dismantling Of Old Over Head Maintenance Beams (Joist) At Ps 5 Main Washing Plant N Ps8 N 9 N Fabrication, Erection N Alignment, Of The Same After Providing Extra Supports For Strengthening Of Structure At Rajrappa Washery Project
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_325840_1 |
|
Reference Number |
GM(R)/SO(W)/Rjp/24-25/Et119dt 16.01.25 |
| Tender Fee | 0 |
| EMD | 11300 |
| Tender Value | - |
| Place | RAJRAPPA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=337749 |
| Start Date | January 17, 2025 23:30 |
| End Date |
Expired
27/01/2025
Expired 625 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rate contract for supply of steel supports (r.s. joist, h beams) for a period of one year
Rate contract for supply of steel supports (r.s. joist, h beams) for a period of one year
Read moreDismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Read moreFabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery
Fabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery
Read moreDismantling, fabrication, erection n alignment of belt structure of 512 n 549 belt n discharge chute liner of 1001 n 513 belt under main washing plant of rajrappa washery project.
Dismantling, fabrication, erection n alignment of belt structure of 512 n 549 belt n discharge chute liner of 1001 n 513 belt under main washing plant of rajrappa washery project.
Read moreDismantling fabrication erection n alignment of tray n catch pan hopper liner plate n motor base of usl screen under main washing plant ps 5 of rajrappa washery project
Dismantling fabrication erection n alignment of tray n catch pan hopper liner plate n motor base of usl screen under main washing plant ps 5 of rajrappa washery project
 
Read moreProviding, fabrication, erection n alignment of hand railing by welding to steel ladder railing ms tube 40mm at top up silo ps 8 n 9 (wc n wcp) bunker at rajrappa washery.
Providing, fabrication, erection n alignment of hand railing by welding to steel ladder railing ms tube 40mm at top up silo ps 8 n 9 (wc n wcp) bunker at rajrappa washery.
Read moreDismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Dismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Read moreDismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Dismantling, overhauling, repairing, assembling, erection, alignment,
 testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Read moreRepairing of sizing screens and replacement of 1400mm p/n, n/n belt under raw coal section of rajrappa washery project
Repairing of
 sizing screens and replacement of 1400mm p/n, n/n belt under raw coal section of rajrappa washery project.
Read moreAmc of one year (365 days) for the work of dismantling, shifting, erection n alignment of motors of different circuit section) of electrical section of rajrappa washery project.
Amc of one year (365 days) for the work of
 dismantling, shifting, erection n alignment of motors of different circuit
 (section) of electrical section of rajrappa washery project.
Read moreof your Industry type