Tender Details
Particulars | Details |
---|---|
Title |
Dismantling Of Old Over Head Maintenance Beams (Joist) At Ps 5 Main Washing Plant N Ps8 N 9 N Fabrication, Erection N Alignment, Of The Same After Providing Extra Supports For Strengthening Of Structure At Rajrappa Washery Project
|
Description |
Dismantling Of Old Over Head Maintenance Beams (Joist) At Ps 5 Main Washing Plant N Ps8 N 9 N Fabrication, Erection N Alignment, Of The Same After Providing Extra Supports For Strengthening Of Structure At Rajrappa Washery Project
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_325840_1 |
Reference Number |
GM(R)/SO(W)/Rjp/24-25/Et119dt 16.01.25 |
Tender Fee | 0 |
EMD | 11300 |
Tender Value | |
Place | RAJRAPPA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=337749 |
Start Date | January 17, 2025 23:30 |
End Date |
27/01/2025 ( Expired 107 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling, fabrication/erection of 51 bc discharge chute and di gate clean coal and middling coal of main plant plant of sawang washery.
Dismantling, fabrication/erection of 51 bc discharge chute and di gate clean coal and middling coal of main plant plant of sawang washery.
Read moreFabrication and erection of receiving chute liner plate, horizontal plate and side plate of unit no. 202 after dismantling the same at 17 mtr level in hms section of kathara washery
Fabrication and erection of receiving chute liner plate, horizontal plate and side plate of unit no. 202 after dismantling the same at 17 mtr level in hms section of kathara washery
Read moreDismantling, fabrication/erection of vibro feeder structure, chutes gate etc. 01 no., 02 no. road side and 03, 05 no. store side in main plant plant of sawang washery.
Dismantling, fabrication/erection of vibro feeder structure, chutes gate etc. 01 no., 02 no. road side and 03, 05 no. store side in main plant plant of sawang washery.
Read moreDismantling, fabrication, erection n alignment of underflow and overflow chutes of apron grizzly, two way discharge chutes of 301 a n b belts and the other jobs as per requirement under raw coal section of rajrappa washery
Dismantling, fabrication, erection n alignment of underflow and overflow chutes of apron grizzly, two way discharge chutes of 301 a n b belts and the other jobs as per requirement under raw coal section of rajrappa washery
Read moreRepair, erection and fabrication of weigh bridge (50te) old damaged structure plate dismantling and shifting to scrap yard and new structure making at kathara washery
Repair, erection and fabrication of weigh bridge (50te) old damaged structure plate dismantling and shifting to scrap yard and new structure making at kathara washery
Read moreFabrication and erection of supporting structure with channel joist and plate of road weigh bridge (60 te) and different type of work and old structure dismantling with m.s material under ktw
Fabrication and erection of supporting structure with channel joist and plate of road weigh bridge (60 te) and different type of work and old structure dismantling with m.s material under ktw
Read moreDismantling, fabrication, erection n alignment of belt structure of 512 n 549 belt n discharge chute liner of 1001 n 513 belt under main washing plant of rajrappa washery project.
Dismantling, fabrication, erection n alignment of belt structure of 512 n 549 belt n discharge chute liner of 1001 n 513 belt under main washing plant of rajrappa washery project.
Read moreDismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Dismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Read moreFabrication/erection of 44 pump (thickener under flow) delivery pipeline from thickener to slurry tank, f/e and changing of slurry storage tank at main plant of sawang washery, f/e and repairing of over flow pipeline from slurry storage tank to head
Fabrication/erection of 44 pump (thickener under flow) delivery pipeline from thickener to slurry tank, f/e and changing of slurry storage tank at main plant of sawang washery, f/e and repairing of over flow pipeline from slurry storage tank to head
Read moreDismantling of old over head maintenance beams (joist) at ps 5 main washing plant n ps8 n 9 n fabrication, erection n alignment, of the same after providing extra supports for strengthening of structure at rajrappa washery project
Dismantling of old over head maintenance beams (joist) at ps 5 main washing plant n ps8 n 9 n fabrication, erection n alignment, of the same after providing extra supports for strengthening of structure at rajrappa washery project
Read moreof your Industry type