Tender Details
Particulars | Details |
---|---|
Title |
Sr Work Flooring Work And Interlocking Paver Block Work At Bunglow No. 1 Under Residency Section Indore
|
Description |
Sr Work Flooring Work And Interlocking Paver Block Work At Bunglow No. 1 Under Residency Section Indore
|
Organisation | PWD- Roads and Bridges | State Govt. and UT |
Tender Id | 2024_PWDRB_359994_1 |
Reference Number |
05/SAC/2024-25/Indore Dated - 26-07-2024(14) |
Tender Fee | 2295 |
EMD | 8460 |
Tender Value | |
Place | INDORE |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=423582 |
Start Date | July 29, 2024 15:30 |
End Date |
06/08/2024 ( Expired 310 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreCa no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Read moreSpecial repair to bldg no t 13 15 a and certain other sanctioned works at lekhapani under ge dinjan no 2
Special repair to bldg no t 13 15 a and certain other sanctioned works at lekhapani under ge dinjan no 2
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreLaying of paver blocks from mohada dafaai from achhelals house via baigan basti and basor mohalla to st. joseph till the main road of tyagi hotel and naman agency at ward no 6
Laying of paver blocks from mohada dafaai from achhelals house via baigan basti and basor mohalla to st. joseph till the main road of tyagi hotel and naman agency at ward no 6
Read moreLaying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1
Laying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreSupply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502.
Supply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502
Read moreConstruction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreof your Industry type