Tender Details
Particulars | Details |
---|---|
Title |
Installation, Repairing, Testing, Commissioning, Prive Maintenance, And Demonstration Including Supply Of Required Spares Of Ctr Make, Nifpe Sfor 5 Nos. Of 33/6.6 K V, 10 Mva Transformers Installed At Ob And Coal Substation Of Khadia Project
|
Description |
Installation, Repairing, Testing, Commissioning, Prive Maintenance, And Demonstration Including Supply Of Required Spares Of Ctr Make, Nifpe Sfor 5 Nos. Of 33/6.6 K V, 10 Mva Transformers Installed At Ob And Coal Substation Of Khadia Project
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_NCL_318923_1 |
Reference Number |
KHD/EM/E-Tender/24-25/291 Date 08.10.2024 |
Tender Fee | 0 |
EMD | 15100 |
Tender Value | |
Place | GM Office Khadia |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330614 |
Start Date | October 10, 2024 23:30 |
End Date |
21/10/2024 ( Expired 205 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing and commissioning of scada related materials in newly sanctioned 33/11 kv valmikidham, nagtalai and nanakheda substation under jurisdiction of o and m circle of mppkvvcl ujjain under simhasth-2028 scheme
Supply, installation, testing and commissioning of scada related materials in newly sanctioned 33/11 kv valmikidham, nagtalai and nanakheda substation under jurisdiction of o and m circle of mppkvvcl ujjain under simhasth-2028 scheme
Read moreFor repairing and servicing of ctr make n2 fire protection system installed on 100 mvar t/f ist areva make and 60 mva tf ii technical associate make at 220 kv sub station sikandrabad under etd bulandshahr
For repairing and servicing of ctr make n2 fire protection system installed on 100 mvar t/f ist areva make and 60 mva tf ii technical associate make at 220 kv sub station sikandrabad under etd bulandshahr
Read moreTransformer oil testing of 3 nos. 5 mva transformers installed in substation a and 12 nos. in chp of kakri project.
Transformer oil testing of 3 nos. 5 mva transformers installed in substation a and 12 nos. in chp of kakri project.
Read moreSupply, installation, testing and commissioning of 3 nos x 7 tr precision type package a/c units with comprehensive maintenance for 5 years for old e-10 b switch room at telephone bhawan, cuttack.in replacement of existing 6x7tr conventional package
Power provision for 6 nos 3 tr ductable ac units
Read moreBush cutting, tree trimming and uprooting of grass in and arounf sub station (10 mva/5 mva, various tss) and underneath over headlines (ht -33, 11 , 3.3 kv ) and lt oh lines for safety and prive maintenance in the upcoming monsoon under ashok oc
Bush cutting, tree trimming and uprooting of grass in and arounf sub station (10 mva/5 mva, various tss) and underneath over headlines (ht -33, 11 , 3.3 kv ) and lt oh lines for safety and prive maintenance in the upcoming monsoon under ashok oc
Read moreRate contract for procurement of 33/11 kv 5 mva low loss (4/23 kw) and 10 mva low loss (8/50kw) power transformers for a period of one year
Rate contract for procurement of 33/11 kv 5 mva low loss (4/23 kw) and 10 mva low loss (8/50kw) power transformers for a period of one year
Read moreSupply erection testing and commissioning of 6.3 mva,33/6.6 kv transformer with buy back of faulty 6.3 mva transformer of spare bay at stage 2 ofvarangaon talwel lift irrigation scheme tal bhusawal dist jalgaon
Supply erection testing and commissioning of 6.3 mva,33/6.6 kv transformer with buy back of faulty 6.3 mva transformer of spare bay at stage 2 ofvarangaon talwel lift irrigation scheme tal bhusawal dist jalgaon
Read moreRepairing and maintenance of transformers (ratings 5mva 33/6.6 kv, 3.15 mva, 33/6.6kv and 2mva 33/3.3kv) and filtration of transformer oil of block-b project
Repairing and maintenance of transformers (ratings 5mva 33/6.6 kv, 3.15 mva, 33/6.6kv and 2mva 33/3.3kv) and filtration of transformer oil of block-b project
Read moreRepairing of three nos. of 3step apfc panel with 1600 kvar, 7.2kv, 3ph, 50hz capacitor bank installed at 2x12.5 mva, 33/6.6 kv main substation of rajrappa project.
Repairing of three nos. of 3step apfc panel with 1600 kvar, 7.2kv, 3ph, 50hz capacitor bank installed at 2x12.5 mva, 33/6.6 kv main substation of rajrappa project.
Read moreAward of contract for system strengthening works for survey, installation, testing and commissioning of new 5 mva 33-11kv substationunder onm circle shahdol
Award of contract for system strengthening works for survey, installation, testing and commissioning of new 5 mva 33-11kv substationunder onm circle shahdol
Read moreof your Industry type