Tender Details

About Tender

🏗️ Invitation For Bids: Ob Substation Development In Khadia 🏗️ Northern Coalfields Limited (Nccl), A Public Sector Undertaking, Is Seeking Bids From Experienced Contractors For The Development Works Of A New Ob (Outdoor Bulk) Substation In The Khadia Area. 🔌 📅 Bid Submission Deadline: April 03, 2024, 11:00 Am The Earnest Money Deposit (Emd) Is Set At Inr 249,600. Interested Bidders Must Submit Detailed Proposals, Including Technical Capabilities, Project Execution Plans, And Financial Bids, By The Stipulated Deadline. Keywords: Development Works, Ob Substation, Khadia Project, Northern Coalfields Limited, Public Sector Undertaking, Electrical Infrastructure, Bid Submission, Emd
Particulars Details
Title
Development Works In New Ob Substation In Khadia Project
Description
Development Works In New&#X0d Ob Substation In Khadia&#X0d Project
Organisation Northern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_NCL_305482_1
Reference
Number
GM/KHD/C/23-24/ETN-533
Tender Fee 0
EMD 2.5 Lakh
Tender Value -
Place Khadia Area
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=316531

Start Date March 19, 2024 16:30
End Date
Expired 03/04/2024

Expired 922 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Construction of earth pits in sccl 132/33 kv substation, corporate

Construction of earth pits in sccl 132/33 kv substation, corporate

Read more
Annual maintenance contract (amc) of operator cabin air conditioning system of 04 nos epiroc make drill machines of khadia project for a period of 01 year (365 days).

Annual maintenance contract (amc) of operator cabin air conditioning system of 04 nos epiroc make drill machines of khadia project for a period of 01 year (365 days).

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Erection of 4th 80mva ptr at 132kv ss erragadda substation in omc metro central circle/metro-zone-i

Erection of 4th 80mva ptr at 132kv ss erragadda substation in omc metro central circle/metro-zone-i

Read more
Selection of agency for streetlight installation on existing poles and cable laying from substation to oat, bipard, gaya.

Selection of agency for streetlight installation on existing poles and cable laying from substation to oat, bipard, gaya.

Read more
Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl

Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl

Read more
Providing bt road from mannanur nh to prashanth nagar colony connecting amrabad road (substation) of amrabad (m) in nagarkurnool district

Providing bt road from mannanur nh to prashanth nagar colony connecting amrabad road (substation) of amrabad (m) in nagarkurnool district

Read more
Construction of major storm water drain from 33 kv substation to haritha hotel via kerala english medium school in dharmapuri municipality

Construction of major storm water drain from 33 kv substation to haritha hotel via kerala english medium school in dharmapuri municipality

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise