Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Regular Make Up Jetting Header And Fittings For Unit Iii Bottom Ash Hopper
|
| Description |
Supply Of Regular Make Up Jetting Header And Fittings For Unit Iii Bottom Ash Hopper
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_575941_1 |
|
Reference Number |
CE/TTPS/3881-S |
| Tender Fee | 0 |
| EMD | 19800 |
| Tender Value | - |
| Place | SE PA TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=688201 |
| Start Date | June 30, 2025 21:30 |
| End Date |
Expired
15/07/2025
Expired 456 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Read moreSelf cleaning idlers for bac,return flat idlers for bottom ash conveyors,carrying idlers for bottom ash conveyors
Self cleaning idlers for bac,return flat idlers for bottom ash conveyors,carrying idlers for bottom ash conveyors
Read moreRectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Rectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Read moreProcurement of bottom ash and wet ash system spares for overhauling of u-1 and 2 at bktps.
Procurement of bottom ash and wet ash system spares for overhauling of u-1 and 2 at bktps.
Read moreTtps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Ttps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Read moreProcurement of weir minerals make spares of ash slurry series and bottom
Procurement of weir minerals make spares of ash slurry series and bottomash overflow pumps at stage 2 ntpc barauni
Read moreTtps mechii ahp unitiii attending overhauling works in unit iii eco aph hoppers ash disposal system flushing apparatus rubber expansion bellow and allied sea water pipe lines fittings valves and rectification work in aph hopper platforms and d
Ttps mechii ahp unitiii attending overhauling works in unit iii eco aph hoppers ash disposal system flushing apparatus rubber expansion bellow and allied sea water pipe lines fittings valves and rectification work in aph hopper platforms and d
Read moreTtps mech ii ahp replacement of clinker grinder feed gate assembly power cylinders and its connected pipe lines feed sump hydraulic ejector assembly regular make up jetting assembly connected pipe lines flushing header assembly bah structural
Ttps mech ii ahp replacement of clinker grinder feed gate assembly power cylinders and its connected pipe lines feed sump hydraulic ejector assembly regular make up jetting assembly connected pipe lines flushing header assembly bah structural
Read moreTtps mech ii bm unit iii replacement of wornout supports of eco hoppers inspection of water wall ring headers removal of debris and strengthening of economizer inlet header eco intermediate header steam cooled wall header no 8 and ltsh inlet header d
Ttps mech ii bm unit iii replacement of wornout supports of eco hoppers inspection of water wall ring headers removal of debris and strengthening of economizer inlet header eco intermediate header steam cooled wall header no 8 and ltsh inlet header d
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - overhauling work of bottom ash hopper system and dfa system of unit no 10 btps obra power house equipment service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - overhauling work of bottom ash hopper system and dfa system of unit no 10 btps obra power house equipment service provider
Read moreof your Industry type