Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Road Side Rain Water Harvesting System (With 3 Years O And M) Near Ambedkar Circle, Alwar.Nit01/2025 26/Item10
|
Description |
Construction Of Road Side Rain Water Harvesting System (With 3 Years O And M) Near Ambedkar Circle, Alwar.
|
Organisation | UIT -Alwar-Secretary | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1000 |
EMD | 14800 |
Tender Value | |
Place | UIT ALWAR |
Link |
AAAAAAAAAA Login to view |
Start Date | April 22, 2025 15:00 |
End Date |
01/05/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Hiring of latest model-2025 of 1 no. new petrol car (4plus1-seater) / equivalent or utilization period of petrol car up to 04 years or 1,50,000 kms. and registration in taxi quota for official/field use of se (eht-m) circle, mpptcl, jabalpur
Hiring of latest model-2025 of 1 no. new petrol car (4plus1-seater) / equivalent or utilization period of petrol car up to 04 years or 1,50,000 kms. and registration in taxi quota for official/field use of se (eht-m) circle, mpptcl, jabalpur
Read moreProcurement of additional civil works for g plus 2 seoc building and g plus 3 asdma building in guwahati assam including 3 years of o and m period under airbmp
Procurement of additional civil works for g plus 2 seoc building and g plus 3 asdma building in guwahati assam including 3 years of o and m period under airbmp
Read moreWater supply scheme for augmentation of uwss udaipur under district udaipur including 05 years o and m after 01 year defect liability period under amrut 2.0
Water supply scheme for augmentation of uwss udaipur under district udaipur including 05 years o and m after 01 year defect liability period under amrut 2.0
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) providing and applying all types of painting as mentioned paint.
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and applying all types of painting as mentioned paint.
Read moreDesign and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Read moreP, l, j, testing and comm. of pipe line for rising main, cons. and comm. of reservoirs and pumping system, source and ancillary works with o and m of the system for 5 years for 21 villages of kgbas block and 01 urban town kishangarhbas
P, l, j, testing and comm. of pipe line for rising main, cons. and comm. of reservoirs and pumping system, source and ancillary works with o and m of the system for 5 years for 21 villages of kgbas block and 01 urban town kishangarhbas
Read moreHiring of 02 nos. each truck mounted mist cannon system and truck mounted road sweeper system along with manpower for period of three years at dpa
Hiring of 02 nos. each truck mounted mist cannon system and truck mounted road sweeper system along with manpower for period of three years at dpa
Read moreConstruction of flood protection wall, rain water harvesting, ramps at 66 kv s/s bajeke under o and m division fazilka
Construction of flood protection wall, rain water harvesting, ramps at 66 kv s/s bajeke under o and m division fazilka
Read moreof your Industry type