Tender Details
Particulars | Details |
---|---|
Title |
Outside Washing Of U 3 Boiler, During Oh Period, Which Will Be Ed Tentatively From December 2025 At Sg Tpp.
|
Description |
Outside Washing Of U 3 Boiler, During Oh Period, Which Will Be Ed Tentatively From December 2025 At Sg Tpp.
|
Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 4820 |
Tender Value | |
Place | Sagardighi Thermal Power Project. |
Link |
AAAAAAAAAA Login to view |
Start Date | June 09, 2025 15:30 |
End Date |
16/06/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Painting of 315 mva gt-5, 40mva st-3 and st-4, 20mva uat-5a and uat-5b under emoph, stps during u-5 oh in december-2025.
Painting of 315 mva gt-5, 40mva st-3 and st-4, 20mva uat-5a and uat-5b under emoph, stps during u-5 oh in december-2025.
Read moreEngagement outsourcing of manpower for operational work of grid sub stations day to day works at tc transmission central store dumka at deoghar inspection bungalow and offices under transmission zone ii dumka for the period from 01 07 2025 to 31 03
Engagement outsourcing of manpower for operational work of grid sub stations day to day works at tc transmission central store dumka at deoghar inspection bungalow and offices under transmission zone ii dumka for the period from 01 07 2025 to 31 03
Read moreRate contract for creation of 25 kva 63 kva 100 kva 250 kva 3-phase distribution transformer on turnkey basis at different locations along with ht/lt in electric division-iiijammu during the fin yr 2025-26 or till next tender is finalized.
Rate contract for creation of 25 kva 63 kva 100 kva 250 kva 3-phase distribution transformer on turnkey basis at different locations along with ht/lt in electric division-iii jammu during the fin yr 2025-26 or till next tender is finalized.
Read moreEngagement of manpower for ct cold basin-1 cleaning during overhauling of unit-1, 2025 at sgtpp.
Engagement of manpower for ct cold basin-1 cleaning during overhauling of unit-1, 2025 at sgtpp.
Read moreEngagement of pump for dewatering, de-sludging at ct basin-3 during overhauling of unit3, 2025 at sgtpp, wbpdcl.
Engagement of pump for dewatering, de-sludging at ct basin-3 during overhauling of unit3, 2025 at sgtpp, wbpdcl.
Read moreProcurement of castable firecrete refractory for insulation work of inside bottom ash hopper unit 3 during overhauling in 2025 26 for sgtpp wbpdcl
Procurement of castable firecrete refractory for insulation work of inside bottom ash hopper unit 3 during overhauling in 2025 26 for sgtpp wbpdcl.
Read moreNecessary repairing works to seepage from outside periphery at basement and reconstruction of damaged sewer-line at ground floor of civil defense building situated at 81/2/2 phears lane, kol-700012, under city division, pwd, during the year 2025
Necessary repairing works to seepage from outside periphery at basement and reconstruction of damaged sewer-line at ground floor of civil defense building situated at 81/2/2 phears lane, kol-700012, under city division, pwd, during the year 2025
Read moreAAAAAAAAAA
Login to viewOperation and maintenance of sludge pumping machinery and providing necessary for bailing out water slurry, sand, silt etc by plant machinery from sludge tank of sludge house under aaa surface based w/s project at dongaria under smd, phe dte.
Read moreAssistance job for inspection, checking and servicing of id fan motor and md bfp motor in situ condition during unit-3 overhauling at sgtpp.
Assistance job for inspection, checking and servicing of id fan motor and md bfp motor in situ condition during unit-3 overhauling at sgtpp.
Read moreFdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Read moreof your Industry type