Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Girls Hostel, Boundary Wall And Main Gate In Eklava Model Residential School Piparkhad, District Sonebhadra
|
Description |
Construction Of Girls Hostel, Boundary Wall And Main Gate In Eklava Model Residential School Piparkhad, District Sonebhadra
|
Organisation | U.P. State Construction and Infrastructure Development Corporation Ltd. | State Govt. and UT |
Tender Id | 2024_SCIDC_879417_1 |
Reference Number |
41/Tender/SE/SON/2023-24 Date 09.01.2024 |
Tender Fee | 2600 |
EMD | 3 Lakh |
Tender Value | |
Place | Piparkhad, District Sonebhadra |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1501451 |
Start Date | January 10, 2024 19:30 |
End Date |
24/01/2024 ( Expired 520 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh
Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreUp-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreConstruction of rob at railway crossing on roteda to sogariya road in district kota
Construction of rob at railway crossing on roteda to sogariya road in district kota
Read moreEngineering, procurement and construction work of 04 lane railoverheadbridge, 04 lane flyover on gt road and 02 lane flyover on ghantaghar road in lieu of level crossing no. 02 special (nearjarib chowki) of kanpur-anwarganj-rawatpur railway section
Engineering, procurement and construction work of 04 lane railoverheadbridge, 04 lane flyover on gt road and 02 lane flyover on ghantaghar road in lieu of level crossing no. 02 special (nearjarib chowki) of kanpur-anwarganj-rawatpur railway section
Read moreIntegration of boys hostel with dmrc academy, construction of new simulator room backside of a-block dmrc academy, development of lounge area on 1st and 2nd floor of boys hostel and provision of new entry/exit at shastri park depot.
Integration of boys hostel with dmrc academy, construction of new simulator room backside of a-block dmrc academy, development of lounge area on 1st and 2nd floor of boys hostel and provision of new entry/exit at shastri park depot.
Read moreof your Industry type