Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Sampark Marg From Saraydaulat Ramashram Marg To Village Mishrapur At Block Chhibramau
|
| Description |
Construction Of Sampark Marg From Saraydaulat Ramashram Marg To Village Mishrapur At Block Chhibramau
|
| Organisation | Director Cum Chief Engineer RED | State Govt. and UT |
| Tender Id | 2026_REDUP_1145301_3 |
|
Reference Number |
15/RED/Tender/TAVY(Kannauj) Dt. 02.04.2026 |
| Tender Fee | 3500 |
| EMD | 93000 |
| Tender Value | - |
| Place | Kannauj |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2141580 |
| Start Date | May 05, 2026 22:20 |
| End Date |
Expired
05/06/2026
Expired 110 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
1)construction of the storm water drain from agriculture market to saidapur cross road, 2) construction of the storm water from karimnagar road to model cheruvu (via srinagar colony entrance) in huzurabad municipality under nagarabhivrudhi funds - 6th call
1)construction of the storm water drain from agriculture market to saidapur cross road, 2) construction of the storm water from karimnagar road to model cheruvu (via srinagar colony entrance) in huzurabad municipality under nagarabhivrudhi funds - 6th call
Read more1) construction of the storm water drain from srisapally cross road, 2) construction of the storm water from prathapa sai reddy garden to gundla cheruvu water way in huzurabad municipality under nagarabhivrudhi funds -6th call
1) construction of the storm water drain from srisapally cross road, 2) construction of the storm water from prathapa sai reddy garden to gundla cheruvu water way in huzurabad municipality under nagarabhivrudhi funds -6th call
Read moreGodavari pushkaralu 2027 construction of a cc road from main ghat to saraswathi ghat with central lighting at kaleshwaram (v) mahadevpur (m) jayashankar bhupalpally district
Godavari pushkaralu 2027 construction of a cc road from main ghat to saraswathi ghat with central lighting at kaleshwaram (v) mahadevpur (m) jayashankar bhupalpally district
Read moreConstruction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration
Construction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration
Read morePart design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreSurvey, investigation, design, supply, erection, testing and commissioning of lis for supplementing water to suffering atchkat of 3997ha of d 76 of tlbc by lifting water from tungabhadra river near yedival village of manvi taluk, raichur district on turnkey basis, phase i
Work comprising of construction of intake structure, jack well cum pumphouse, pumping machineries (2 pumps), 33/6.6kv electrical substation with power transformer, 33kv transmission line, 110/33kv transformer bay with 33kv terminal bay, rising main including supply of spare parts and tools, o and m for five years after successful commissioning of the entire scheme on turnkey basis
Read moreConstruction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration
Construction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreBelan nahar ki patari to mishrapur sampark marg
Belan nahar ki patari to mishrapur sampark marg
Read moreSpecial repair work of mishrapur khatikan sampark marg
Special repair work of mishrapur khatikan sampark marg
Read moreof your Industry type